Laserfiche WebLink
Josh Nyquist,Executive Director of Building Operations May 26,2022 <br /> PACT Charter School I Traffic Impact Study Page 19 <br /> Combined Sunday A.M.St. Katharine Drexel Church Development Conditions <br /> The Sunday a.m. church related existing geometrics, traffic control, and traffic volumes and traffic <br /> operations analysis related to the adjacent future proposed St. Katharine Drexel Church have been <br /> combined with year 2028 No-Build and Build scenario Sunday a.m. church peak hour (9:30-10:30 <br /> a.m.) traffic operations analyses. Results of the combined Sunday a.m. church peak hour traffic <br /> operations analysis (shown in Table 7) indicate that all study intersections are expected to operate at <br /> an acceptable overall LOS A during the peak hour under existing traffic control and intersection <br /> geometrics. No significant queuing or delay issues were identified in this analysis. <br /> Table 8. Sunday A.M.St. Katharine Drexel Church Combined Conditions Peak Hour Traffic Analysis <br /> Existing Sunday 2028 No-Build Sunday 2028 Build Sunday <br /> Study Intersection A.M. Peak Hour A.M. Peak Hour A.M. Peak Hour <br /> LOS Delay Queue LOS Delay Queue LOS Delay Queue <br /> Variolite Street/173rd Avenue(1) A/A 9 sec. NB/1 A/A 9 sec. NB/ A/A 9 sec. NB/1 <br /> Variolite Street/161st Avenue(1) A/A 10 sec. WB/1 A/A 10 sec. WB/1 A/B 11 sec. WB/1 <br /> Variolite Street/Alpine Drive(1) A/A 10 sec. SB/1 A/A 10 sec. SB/1 A/A 10 sec. SB/1 <br /> Armstrong Boulevard/161st Avenue(1) A/B 12 sec. WB/1 A/B 12 sec. WB/1 A/B 12 sec. WB/1 <br /> Armstrong Boulevard/Alpine Drive(1) A/B 14 sec. WB/1 A/B 15 sec. WB/1 A/C 16 sec. WB/1 <br /> Armstrong Boulevard/Alpine Drive(3) A/A 5 sec. NB/1 A/A 5 sec. NB/1 A/A 5 sec. N/1 <br /> 161st Ave/Primary Site (East)Access(1) A/A 10 sec. SB/1 <br /> 161st Ave/Secondary Site(West)Access(1) - - - - - - - - - <br /> Ramsey Boulevard/Alpine Drive(2) A/A 10 sec. SB/1 A/A 10 sec. NB/1 A/A 10 sec. NB/1 <br /> 175th Avenue/Nowthen Boulevard (1) A/B 11 sec. EB/1 A/B 11 sec. EB/1 A/B 11 sec. EB/1 <br /> (1) Indicates a side-street stop-controlled intersection,where the overall LOS is shown followed by the worst approach LOS.The delay shown represents the <br /> worst side-street approach average delay per vehicle.The queue shown is the 95th percentile queue(in vehicles)for the worst approach at the intersection. <br /> The 95th percentile queues shown in red bold font spill back to and beyond the adjacent upstream intersection. <br /> (2) Indicates an all-way stop-controlled intersection,where the overall LOS and average delay per vehicle are shown.The queue shown is the 95th percentile <br /> queue(in vehicles)for the worst side-street approach at the intersection.The 95th percentile queues shown in red bold font spill back to and beyond the <br /> adjacent upstream intersection. <br /> (3) Indicates an improvement to provide a single-lane roundabout intersection,where the overall LOS and average delay per vehicle are shown.The queue <br /> shown is the 95th percentile queue(in vehicles)for the worst side-street approach at the intersection.The 95th percentile queues shown in red bold font <br /> spill back to and beyond the adjacent upstream intersection. <br /> Proposed Site Access/Circulation Review <br /> A review of the proposed PACT Charter School development site plan (see Figure 4) was completed <br /> to identify issues specific to the site plan configuration, site access and circulation and recommend <br /> potential improvements if needed. Vehicular access to/from the proposed site is planned at two <br /> locations on 161st Street: a primary (east) site access approximately 600 feet west of Variolite Street <br /> and a secondary (west) site access approximately 1,150 feet west of Variolite Street. <br />