My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/14/2022
Ramsey
>
Public
>
Agendas
>
Council
>
2022
>
Agenda - Council - 06/14/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:32:40 PM
Creation date
6/28/2022 9:17:14 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/14/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
695
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK AND STAGING AREAS: The Contractor shall confine their work activities within City <br /> owned properties, right of way, and drainage & utility easements. No equipment shall be left on <br /> City streets outside normal working hours. <br /> TRAFFIC CONTROL:Work shall be conducted in conformance with the specifications set forth <br /> herein and in accordance with the Minnesota Department of Transportation Standard <br /> Specifications for Construction, 2020 Edition, which is incorporated by reference to these <br /> specifications. <br /> PAYMENT: Payment will be made upon submittal of an invoice to the City on a net 30-day basis <br /> following City acceptance of the work. An IC 134 form will be required prior to final payment. <br /> BASIS OF PAYMENT: Payment shall be made on a lump sum basis for all components of the <br /> work as specified in the RFP. The cost of any additional equipment, labor,materials,permits,tools <br /> and supplies which have not been specifically identified in this section for payment, but are <br /> required to complete the work, shall be considered incidental to the project. The City is also <br /> requesting an hourly rate for additional survey work to be submitted, if we find a need to expand <br /> the project scope after reviewing the initial survey. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.