My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/12/2022
Ramsey
>
Public
>
Agendas
>
Council
>
2022
>
Agenda - Council - 07/12/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:34:08 PM
Creation date
7/12/2022 9:10:31 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/12/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
614
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Plan <br /> The proposed school facility has a building footprint of approximately 73,000 square feet and would be two (2) <br /> stories. The Applicant has shared recently that the school building may be constructed in phases. This is due in large <br /> part to current market conditions related to construction and financing costs. The proposed height would be less <br /> than thirty-five(35) feet,which is the maximum allowed. Parking would be provided on all four sides of the school. <br /> The proposal also includes an athletic field north of the school,track and field areas. The building appears to exceed <br /> all required setbacks from property lines, as do the proposed parking and maneuvering areas,with the exception of <br /> the eastern property boundary(common lot line between the school and the future church site). On May 26,2022, <br /> the Planning Commission did approve a variance for a reduced parking and maneuvering area setback along the <br /> eastern boundary Lot 1, Block 1. <br /> Building Architecture <br /> The exterior finish of the school will include a combination of color integrated precast concrete panels, a small <br /> percentage of metal paneling as an accent, and windows. Additionally, a waste enclosure is also proposed and <br /> would consist of Concrete Masonry Units (CMUs)with composite wood decking boards for a gate. The Site Plan <br /> does identify an area abutting,but outside,the waste enclosure, as a'Farm Bin'. Staff has asked for clarification on <br /> what this is and why it is outside the enclosure. The exterior finish materials of the school and waste enclosure <br /> meet the standards of the B-1 General Business District. <br /> Streets and Access <br /> There are no new roads proposed. The Subject Property is between Armstrong Boulevard(Minor Arterial) and <br /> Variolite Street(Major Collector) and will be accessed from 161 st Avenue(a Municipal State Aid or MSA street, <br /> which are generally designed or intended for higher volumes of traffic than typical local roads). There are two (2) <br /> proposed access points on 161 st Avenue. The eastern access will serve as the bus entrance and ingress/egress for <br /> pick-up/drop-off and staff parking. The western access will serve as the bus exit and ingress/egress for the student <br /> drivers. A third access was shown as part of the Conceptual Site Plan in February of this year,but that has since <br /> been eliminated. <br /> At the May 26, 2022 meeting, the Planning Commission directed the Applicant to analyze the potential of a <br /> 'right-in/out'bus only access off of Variolite Street. The Applicant's Traffic Engineer provided a response to the bus <br /> only access to Variolite, and did not support this. City Engineering Staff also do not support an access on Variolite <br /> Street due to safety concerns associated with the restricted sight distance related to the vertical curvature of <br /> Variolite Street. <br /> A ten(10) foot wide bituminous trail is required from Variolite Street to the eastern boundary of Central Park. <br /> While the plans were updated to provide sidewalks adjacent to each vehicle entrance, including crosswalks <br /> connecting to the school,the plans still do not show the required trail along 161 st Avenue. The City is currently <br /> reviewing options for the reconstruction of 161 st Avenue, as either a 2023 or 2024 project(scheduled for 2024 but <br /> would make sense to bump it up to 2023). The reconstruction will include the 10-foot bituminous trail,but it should <br /> be reflected on the plans. If the installation of the public trail results in significant tree loss in this green space, <br /> which is likely, Staff would recommend that PACT install a 3-4 foot tall berm that is densely landscaped. This <br /> would help provide some visual relief for the neighbors south of 161 st Avenue. <br /> Parking <br /> The Applicant provided a summary of parking needs and proposed parking. At full capacity,PACT anticipates a <br /> student population of 790 students, 130 full-time faculty and staff, and another roughly 30 part-time staff. PACT <br /> anticipates about fifteen percent(15%) of the student population will drive themselves to school with the remainder <br /> of the students riding the bus (60%) or getting dropped off and picked up by parents (25%). The Site Plan includes <br /> a total of 291 parking stalls. While City Code does not specifically address parking requirements for schools, this <br /> does seem reasonable. <br /> The Applicant's narrative also indicates that there are ongoing discussions with Saint Katharine Drexel Church <br /> about the possibility of shared parking for events. The typical operating hours of the two uses would be offsetting <br /> and thus,this seems like a reasonable approach to accommodate various events. A Shared Parking Agreement <br />
The URL can be used to link to this page
Your browser does not support the video tag.