My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Public Works Committee - 06/21/2022
Ramsey
>
Public
>
Minutes
>
Public Works Committee
>
2022
>
Minutes - Public Works Committee - 06/21/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:51:01 PM
Creation date
7/22/2022 8:43:24 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Public Works Committee
Document Date
06/21/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
half the water is running off the roads into the driveways and ditches. He believed that regrading <br /> a better swale and resizing the culvert would provide a solution. He believed the pond to the west <br /> was adequately sized. <br /> Chairperson Riley commented that again it seems that the replacement of the septic system was <br /> the cause of these issues. <br /> City Engineer Westby replied that typically when a new system is installed it is put in a new <br /> location and perhaps that was part of the issue. He stated that staff could look to see what <br /> perpetuated the drainage issue, look at potential costs for regrading, and potential impacts. <br /> Chairperson Riley recognized the hesitancy of the Committee to spend $500,000 to fix something <br /> that was caused by replacement of a septic system. <br /> Councilmember Musgrove asked if this would be a situation where a rain garden could help. <br /> City Engineer Westby replied that he is unsure of the soil types in that area or level of the water <br /> table. He commented that with the wetland complex to the west he would guess the water table <br /> could be high. He identified other properties that have reached out to the City with complaints on <br /> this topic. He commented that when the original property owner put the septic system in, he did <br /> have problems with water coming into his basement. <br /> Mr. Buchholz commented that per the MS4 Permit, the City is not allowed to send water from the <br /> right-of-way onto private land. He commented that if there is not drainage and utility easement <br /> through Mr. Ridgeway's property, drainage cannot be sent into that area. <br /> City Engineer Westby replied that there is an issue, and Staff's proposed design would prevent <br /> that from occurring and prevent the City from having to purchase an easement. He explained that <br /> when the City was incorporated, it incorporated the existing drainage systems and issues. <br /> Chairperson Riley commented that he is shocked at the cost. <br /> Councilmember Woestehoff referenced property four in the diagram which he believed does have <br /> an easement. He asked if the issue is that the easements are not in the right place and in order to <br /> use that easement there would need to be significant tree removal. <br /> City Engineer Westby stated that in order to direct water to that location, water would need to be <br /> rerouted which would include regrading. <br /> Councilmember Woestehoff commented that there is an easement between properties seven and <br /> four. <br /> City Engineer Westby replied that there is easement but that is not where the drainage wants to go. <br /> He stated that if they were going to perpetuate drainage through the yard, an easement would need <br /> to be purchased. <br /> Public Works Committee/June 21, 2022 <br /> Page 4 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.