SOIL BORING REQUIREMENTS: Soil borings to a depth called out above will be taken at <br />stationing shown on the attached "Boring Hole Location" exhibits. Soil borings will alternate <br />between drive lanes as practical. Cores of the existing bituminous pavement will be required. Cores <br />will be taken to verify thickness and structural integrity of the existing pavement and base. Pictures <br />of the cores will be included in the final report. Any additional depth beyond depth called out will <br />be paid per lineal foot. The Contractor must perform sufficient survey work to locate holes <br />approximately 5 feet horizontally and approximately 0.5 feet vertically. The Contractor is <br />responsible for locating all utilities prior to starting boring operations. <br />SOIL BORING LOG REQUIREMENTS: A field boring log will be prepared by the Contractor <br />for each boring with a copy included in the final report. The field boring logs will include; <br />• The project identification number <br />• Location of the boring referenced by centerline stationing <br />• Boring log number <br />• Method of drilling and sampling, diameter of bore hole <br />• Date, name of driller and crew <br />• Ground surface elevation and ground water elevation measured to the nearest 0.5 feet <br />• Definition of all symbols that are not otherwise self-explanatory <br />• Classification, thickness, color, moisture condition (dry, moist, wet, saturated), <br />composition and degree of compactness <br />• Field number of any samples taken, type of sample and depth taken <br />• Depth at which obstacles were encountered in advancing the boring <br />• Any other unusual conditions encountered during drilling and sampling <br />SCHEDULE: A written schedule of the work shall be submitted identifying all work components <br />and showing work start and completion dates required to comply with the schedule. Once work <br />has commenced, the Contractor shall continuously pursue completion in accordance with the <br />approved schedule. The final Geotechnical Report must be delivered to the City by Monday, <br />October 31, 2022. <br />PROPOSAL SUBMITTAL: An itemized quote shall be submitted for the proposed work using <br />the form at the end of this Request for Proposal (RFP). <br />COMMUNICATION WITH THE CITY: If any requirements of this RFP are not clearly <br />understood, the Contractor is responsible for contacting the City for further clarification in a <br />prompt manner. Responses to inquiries, if they change or clarify the RFP in a substantial manner, <br />will be forwarded by addenda to the RFP. <br />SUBMISSION: A signed copy of the attached proposal form is requested by 10:00 A.M. <br />Tuesday, August 16, 2022. Deliver to the Ramsey Municipal Center, 7550 Sunwood Drive <br />NW, Ramsey MN 55303 to the attention of Marsha Weidner, Engineering Assistant. E-mail <br />quotes will be accepted and may be sent to MWeidner@cityoframsey.com. <br />4 <br />