My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 07/19/2022
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2022
>
Agenda - Public Works Committee - 07/19/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:37:54 AM
Creation date
9/7/2022 11:00:46 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
07/19/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Committee 5. 1. <br />Meeting Date: 07/19/2022 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Title: <br />Review Updated Costs to Construct Sedimentation Basin Improvements at Sunfish Lake <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to present updated estimated costs for constructing a stormwater sedimentation basin <br />within the wetland south of Sunfish Lake, filling in a sedimentation swale on the south side of the property at 14520 <br />Sunfish Lake Drive NW, and purchasing wetland credits from a wetland bank to mitigate the resulting wetland <br />impacts at a 2:1 ratio. <br />Background: <br />Attached are copies of three AgendaQuick cases discussed with the Public Works Committee on September 15, <br />2015 (case #5674), May 17, 2016 (case #6299), and June 21, 2016 (case #6377. All background information is <br />included in these cases. <br />Also attached are copies of the meeting minutes from these meetings. <br />At the last PWC meeting where this issue was discussed, Staff was directed to bring back updated costs and <br />potential funding mechanisms for the improvements. <br />Timeframe: <br />Staff estimates 15 minutes will be needed to present and discuss this case. <br />Observations/Alternatives: <br />Observations: <br />Only one member of the current Public Works Committee was involved in earlier discussions regarding this case <br />so Staff did not contact the property owner of 14520 Sunfish Lake Drive in advance of this meeting. If the <br />Committee would like to discuss anything related to this case with the property owner, Staff will update them and <br />invite them to the next regularly scheduled meeting. Otherwise, Staff will contact the property owner to inform <br />them of the updated cost estimate and will relay any other information as directed by the Committee. <br />Alternatives: <br />Based on discussion. <br />Funding Source: <br />Staff has updated project cost estimates for the required work. The total estimated project cost is $83,160. Attached <br />is a detailed cost estimate for reference. <br />This cost estimate includes all costs required to construct the settling basin, to construct required storm sewer <br />modifications, to fill in the drainage swale across the rear of the private property, to remove the storm sewer <br />structure at the end of the swale on the west side of the private property, to restore all disturbed areas (sod is <br />proposed on the private property and a wetland seed mix on all other areas), and to vacate the easement the swale <br />was located in. The estimated costs also include 5% contingency costs for unknowns and miscellaneous pay items <br />not included in the cost estimate, as well as 15% indirect costs for administrative, engineering, finance, and legal <br />fees. <br />
The URL can be used to link to this page
Your browser does not support the video tag.