10.3 <br />10.3.1 <br />Table 13 — Public Works Site Costs <br />Unit <br />Est. Quantity <br />7300 <br />Unit Price <br />$230 <br />Calip <br />24" Raw Watermain <br />LF <br />$1,679,000 <br />24" Road Crossing (Ramsey Blvd and <br />Bunker Lake Blvd) - Jacked Casing <br />LF <br />400 <br />$525 <br />$210,000 <br />24" Finished Watermain <br />LF <br />3800 <br />$230 <br />$874,000 <br />20" Raw Watermain <br />LF <br />1300 <br />$185 <br />$240,500 <br />16" Raw Watermain <br />LF <br />1750 <br />$165 <br />$288,750 <br />16" Raw Watermain (Armstrong Blvd) - <br />Jacked Casing <br />LF <br />100 <br />$425 <br />$42,500 <br />Well 8 Meter Vault <br />LS <br />1 <br />$90,000 <br />$90,000 <br />Total <br />$3,424,750 <br />1 Costs are for comparison of alternatives and are not meant to represent the full project costs. <br />Water Shop Site <br />The Water Shop Site for the water treatment plant is City -owned property on the west side of <br />Jasper Street, across the street from the new Public Works Facility. The water treatment plant <br />would require approximately 3.5 acres of land. The current City water operations shop is located <br />on this site. Construction of the water treatment plant on the Water Shop Site would require <br />demolition of the existing water operations shop and abandonment of 142nd Ave NW. A water <br />treatment plant layout for the Water Shop Site is shown on Figure 6 in Appendix I. <br />Raw and rinished Watermain Costs — Water Shop Site <br />The raw and finished watermain required to construct a water treatment plant at the Water Shop <br />Site is shown on Figure 3 in Appendix I. The water main costs are included in Table 14. <br />Because a new Public Works building is being constructed across the street from the Water Shop <br />Site, it is assumed that a new garage is not needed with the water treatment plant. Costs to <br />demolish the existing water operations shop are not included in Table 14. <br />Table 14 — Water Shop Site Costs <br />Item <br />Unit <br />. t. Quantity <br />Unit Pric= <br />Cost1 <br />24" Raw Watermain <br />a <br />LF <br />8627 <br />$230 <br />$1,984,210 <br />24" Road Crossing (Ramsey Blvd and Bunker <br />Lake Blvd) - Jacked Casing <br />LF <br />400 <br />$525 <br />$210 000 <br />24" Finished Watermain <br />LF <br />3800 <br />$230 <br />$874,000 <br />20" Raw Watermain <br />LF <br />1300 <br />$185 <br />$240,500 <br />16" Raw Watermain <br />LF <br />1750 <br />$165 <br />$288,750 <br />16" Raw Watermain (Armstrong Blvd) - Jacked <br />Casing <br />LF <br />100 <br />$425 <br />$42 500 <br />Well 8 Meter Vault <br />LS <br />1 <br />$90,000 <br />$90,000 <br />Total <br />$3,729,960 <br />1 Costs are for comparison of alternatives and are not meant to represent the full project costs. <br />FEASIBILITY STUDY RAMSY 154354 <br />Page 37 <br />