My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 09/20/2022
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2022
>
Agenda - Public Works Committee - 09/20/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:38:28 AM
Creation date
9/15/2022 3:15:56 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
09/20/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•Ramsey Gateway Highway 10 Improvements (IP#20-11) <br /> •Final design/property acquisitions underway <br /> •Bolton&Menk preparing 95-percent plans and specifications <br /> •Construction anticipated Fall 2023 through early 2026 (2024-2025 majority) <br /> •Riverdale Drive Extension—Llama Street to Bowers Drive (IP#20-05) <br /> • Substantial completion proposed September 30th <br /> •Final completion proposed October 31st <br /> •Wetland 114P Outlet Control Improvements (#19-07) <br /> o Requested by Minnesota DNR <br /> o Staff is preparing plans, including boardwalk reconstruction <br /> o Construction proposed for winter 2022/2023 <br /> City of Anoka Improvement Projects <br /> •Highway 47 Corridor Improvements <br /> •Construction proposed for 2025 <br /> • Anoka webpage https://clients.bolton-menk.com/anokahwy47/ <br /> Anoka County Improvement Projects <br /> •Roundabout at Armstrong Boulevard/CSAH 83 and Alpine Drive (IP#23-03) <br /> o Anoka County received $1.35M in HSIP funds (est. project cost$1.5M) <br /> o Council approved JPA May 24th with City cost share= $28,667.64 <br /> o Construction proposed for 2023,pending final City&County approvals <br /> MnDOT Improvement Projects <br /> •Anoka Solution Highway 10 Improvements <br /> o Construction in progress <br /> o Final completion proposed for Spring 2024 <br /> o Anoka webpage https://clients.bolton-menk.com/hwy10/ <br /> o MnDOT webpage http://www.dot.state.mn.us/metro/projects/hwy10-anoka/ <br /> •US 10/169 &Ferry Street/TH 47 Interchange <br /> o Construction in progress with completion proposed in Spring 2024 <br /> o MnDOT webpage http://www.dot.state.mn.us/metro/projects/hwy10-anoka/ <br /> •Ferry Street/Trunk Highway 47 Grade Separation @ BNSF Rail Crossing <br /> o Preliminary design suspended to explore s-curve realignment <br /> o$45M in bonds authorized October 2020 <br /> o Construction proposed for 2024 or later <br /> o MnDOT webpage http://www.dot.state.mn.us/metro/projects/hwy47rr-anoka/ <br /> •Rum River Bridge Replacement <br /> •Construction in progress with completion proposed in Spring 2024 <br /> •Proposing three lanes each direction between Highway 47 and 7th Street <br /> •MnDOT webpage http://www.dot.state.mn.us/metro/projects/hwy10-anoka/ <br /> Studies &Items of Interest <br /> •5805 148th Lane NW <br /> •No updates. Property owners are content as is. <br /> • Sunfish Lake Sedimentation Basin Improvements <br /> o Property owner is still interested in pursuing their request. <br /> o Staff will delineate rear property line this Fall as time allows. <br /> o Staff anticipates presenting an update to the PWC this Fall. <br /> •Update on Boulevard Trees for Sunwood Drive(Mark Riverblood) <br /> •Emerald Ash Borer Impacts within the City(Mark Riverblood) <br /> •Update on PMP project revisions in 2023-2032 Capital Improvement Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.