My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 09/20/2022
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2022
>
Agenda - Public Works Committee - 09/20/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:38:28 AM
Creation date
9/15/2022 3:15:56 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
09/20/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Committee 6. 1. <br /> Meeting Date: 09/20/2022 <br /> By: Bruce Westby, Engineering/Public <br /> Works <br /> Title: <br /> Receive Updates on Improvement Projects, Studies and Items of Interest <br /> Purpose/Background: <br /> The purpose of this case is to update the Public Works Committee on current and proposed City, County and <br /> MnDOT improvement projects and studies, and on other items of interest to the Committee. <br /> City Improvement Projects <br /> • 161st Avenue Reconstruction (IP#23-01) <br /> o Staff is preparing plans and specifications <br /> o Coordinating design and plans with PACT Charter school <br /> o 2023 construction proposed <br /> o Staff proposes to construct Central Park parking lot improvements separately <br /> • 167th Avenue Reconstruction (IP#23-04) <br /> o Staff is preparing plans and specifications <br /> o Evaluating regional trail alignment and crossings <br /> o 2023 construction proposed <br /> • Sunwood Drive&Waco Street Reconstructions (IP#22-01) <br /> o Construction in progress <br /> o Construction must be complete by September 30th <br /> •Autumn Heights Street Reconstructions (IP#22-02) <br /> o Preconstruction meeting was conducted September 16th <br /> o Substantial completion is required by October 31 st <br /> •2022 Neighborhood Street Overlay Improvements (IP#22-04) <br /> o Construction in progress <br /> o Construction must be complete by September 30th <br /> •Riverdale Drive Trunk Utility Improvements(IP#22-05) <br /> •Construction in progress <br /> • Sanitary sewer lift station almost complete <br /> •Wood Pond Hills 2nd,3rd, 4th, 5th Street Reconstructions (IP#22-06) <br /> o Construction in progress <br /> o Construction must be complete by September 30th <br /> •2022 MSA Pavement Striping Improvements(IP#22-13) <br /> o Construction in progress <br /> • 15410 Argon Street Drainage Improvements (IP#22-14) <br /> • Staff plans to present proposals to City Council October 11th <br /> •Highway 47 Sound Wall north of Xkimo Street(IP#22-17) <br /> o Staff plans to request PWC action in October/November <br /> •WTP Trunk Watermain Improvements (#21-08) <br /> •Plans are being revised to minimize project costs and to include WTP commissioning improvements <br /> (well-house valves, etc.). <br /> • Staff will request Council authorization to advertise bids when material prices decline <br /> • Centralized Water Treatment Plant(#21-09) <br /> • 100-percent plans are complete <br /> • Staff will request Council authorization to advertise bids when material prices decline <br />
The URL can be used to link to this page
Your browser does not support the video tag.