Laserfiche WebLink
· If pruning is necessary, the curs should be made at the branch bark collar, not <br /> flush with the bark. <br />· No trees can be installed within fifteen (15) feet of a hydrant. <br /> <br />A revised landscapin?~p, lan must be submitted that addresses the above stated concerns. <br /> <br />Tree Preservation: A tree inventory and preservation plan must be submitted. The <br />inventory should note the common and Latin name of each tree, the size (DBH) of each <br />tree, and any applicable comments regarding a tree's general conditions (e.g. dead, <br />diseased etc.). The preservation plan should show where tree save fencing will be <br />installed and said fencing must be in place and approved by the City prior to the <br />commencement of construction. <br /> <br />Drainage and'Grading: Please submit a revised drainage plan showin~ the fotl6wing <br />information: <br /> · General revisions of drainage and utility location, based on the revised site plans <br /> dated October 20, 2005. <br /> · drainage areas ' <br /> <br /> · Indicate shots along the existing curb on Sunfish lake Court <br /> · Verify the location of shots in the parking iot and label them <br /> · Indicate the proposed elevation of b,.filding -. <br /> · Check driveway radii to accommodate larger vehicles <br /> · Show easements over proposed watermain <br /> · Show city details for curb and gutter, minimum paving standards, storm manhole, <br /> and valley gutter <br /> · Street repair must be completed in 3 days with a bituminous paver. Elevations on <br /> top and bottom of the retaining wall if higher than 42" a safety fence .will be · <br /> required. <br /> · Please submit these plans to the Lower Rum River Water Management <br /> Organization (LRRWMO) for review and approval. A permit must be obtained <br /> from the LRRWMO. A NPDES permit is also required. <br /> <br />Stormwater Management Fee: The current stormwater management fee required for <br />commercial properties is $3,835 per acre for a total fee of $13,000. The rate in effect at <br />the time of final approval wilt be collected. <br /> <br />Access: The site plan proposes two accesses from Sunfish Lake Cburt, wkich is <br />acceptable. <br /> <br />Ground Cover: The total impervious surface coverage is 28 percent. All unimproved <br />areas must be sodded, including the areas where future building expansions are planned. <br /> <br />Loading Docks: Tl~e site plan outlines two loading docks, plus eight individual loading <br />areas for each proposed bay. <br /> <br />36 <br /> <br /> <br />