My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 10/18/2022
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2022
>
Agenda - Public Works Committee - 10/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:38:47 AM
Creation date
10/13/2022 4:28:39 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
10/18/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Committee 6. 1. <br />Meeting Date: 10/18/2022 <br />By: Bruce Westby, Engineering/Public Works <br />Title: <br />Staff Updates on Improvement Projects, Studies and Items of Interest <br />Purpose/Background: <br />The purpose of this case is to update the Public Works Committee on current and proposed City, County and <br />MnDOT improvement projects and studies, and on other items of interest to the Committee. <br />City Improvement Projects <br />• 161 st Avenue Reconstruction (IP #23-01) <br />o Staff is preparing plans and specifications <br />o Coordinating design and plans with PACT Charter school <br />o Applied for trail grant funding per Council approval <br />o 2023 construction proposed <br />o Staff proposes to construct Central Park parking lot improvements separately <br />• 167th Avenue Reconstruction (IP #23-04) <br />o Staff is preparing plans and specifications <br />o Evaluating regional trail alignment and crossings <br />o Applied for trail grant funding per Council approval <br />o 2023 construction proposed <br />• Sunwood Drive & Waco Street Reconstructions (IP #22-01) <br />o Construction complete e punch list <br />• Autumn Heights Street Reconstructions (IP #22-02) <br />o Construction in progress <br />o Substantial completion by October 31st <br />• 2022 Neighborhood Street Overlay Improvements (IP #22-04) <br />o Construction complete e punch list <br />• Riverdale Drive Trunk Utility Improvements (IP #22-05) <br />• Construction complete e punch list <br />• Wood Pond Hills 2nd, 3rd, 4th, 5th Street Reconstructions (IP #22-06) <br />o Construction complete e punch list <br />• 15410 Argon Street Drainage Improvements (IP #22-14) <br />• See separate case on agenda <br />• Highway 47 Sound Wall north of Xkimo Street (IP #22-17) <br />o Staff will be present a case requesting PWC action on November 15, 2022 <br />• WTP Trunk Watermain Improvements (#21-08) <br />• Plans are being revised to minimize project costs and to include WTP commissioning improvements <br />(well -house valves, etc.). <br />• Staff will request Council authorization to advertise bids when material prices decline <br />• Centralized Water Treatment Plant (#21-09) <br />• Final plans complete <br />• Staff will request Council authorization to advertise bids when material prices decline <br />• Ramsey Gateway Highway 10 Improvements (IP #20-11) <br />• Final design / property acquisitions underway <br />• Bolton & Menk preparing 95-percent plans and specifications <br />• Construction anticipated 2023 through early 2026 (2024 - 2025 majority) <br />• Riverdale Drive east of SLB & temp US 10 widening Spring/Summer 2023 <br />• Riverdale Drive Extension — Llama Street to Bowers Drive (IP #20-05) <br />
The URL can be used to link to this page
Your browser does not support the video tag.