• Construction in progress <br />• Final completion by October 31 st <br />• Wetland 114P Outlet Control Improvements (#19-07) <br />• See separate case on agenda <br />City of Anoka Improvement Projects <br />• Highway 47 Corridor Improvements <br />• Construction proposed for 2025 <br />• Anoka webpage https://clients.bolton-menk.com/anokahwv47/ <br />Anoka County Improvement Projects <br />• Roundabout at Armstrong Boulevard/CSAH 83 and Alpine Drive (IP #23-03) <br />o Anoka County received $1.35M in HSIP funds (est. project cost $1.5M) <br />o Council approved JPA May 24th with City cost share = $28,667.64 <br />o Construction proposed for 2023, pending final City & County approvals <br />MnDOT Improvement Projects <br />• Anoka Solution Highway 10 Improvements <br />o Construction in progress <br />o Final completion proposed for Spring 2024 <br />o 2-lanes open for winter by November 14th <br />o Anoka webpage https://clients.bolton-menk.com/hwv10/ <br />o MnDOT webpage http://www.dot.state.mn.us/metro/projects/hwv10-anoka/ <br />• US 10 / 169 & Ferry Street / TH 47 Interchange <br />o Construction in progress with completion proposed in Spring 2024 <br />o MnDOT webpage http://www.dot.state.mn.us/metro/proiects/hwv10-anoka/ <br />• Ferry Street / Trunk Highway 47 Grade Separation @ BNSF Rail Crossing <br />o Preliminary design suspended to explore s-curve realignment <br />o $45M in bonds authorized October 2020 <br />o Construction proposed for 2024 or later <br />o MnDOT webpage http://www.dot.state.mn.us/metro/projects/hwv47rr-anoka/ <br />• Rum River Bridge Replacement <br />• Construction in progress with completion proposed in Spring 2024 <br />• Proposing three lanes each direction between Highway 47 and 7th Street <br />• MnDOT webpage http://www.dot.state.mn.us/metro/projects/hwy10-anoka/ <br />Studies & Items of Interest <br />• 4805 118 1+ N W <br />• No updates. Property owners are content as is. <br />• Recent Andover Water Supply Issue <br />• Staff will provide an update during the meeting. <br />• Sunfish Lake Sedimentation Basin Improvements <br />o Property owner is still interested in pursuing their request. <br />o Staff will delineate rear property line this Fall as time allows. <br />o Staff anticipates presenting an update to the PWC in November. <br />• CSAH 5 / Nowthen Boulevard Corridor Study <br />• Final report will be reviewed with PWC November 15, 2022 <br />• Elk River Highway 10 Corridor Study <br />• Study website https://www.highwavl0corridorstudy.com/ <br />• Final report will be reviewed with PWC when complete (Jan. 2023?) <br />Timeframe: <br />