My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/07/2005
Ramsey
>
Public
>
Agendas
>
Council
>
2005
>
Agenda - Council - 11/07/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 1:58:21 PM
Creation date
11/4/2005 12:59:58 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/07/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Street, legally described as Lot 1, Block 2, Gateway North Industrial Park. The property is <br />;,.oncd I,;-2 Employment Office and warehousing is permitted within this district. <br /> <br />Mr. Trudgeon advised the proposed building has total lot coverage of 23% and conforms to all <br />r~xlttired setbacks. Building materials are satisfactory and consist of pre-cast, concrete panels <br />and mt~ltiple windows. Additionally, the site plan meets all parking requirements and <br />landscaping and lighting regulations. There are some minor details missing from the grading and <br />drainage plans, which is addressed in the staff review letter. He explained the applicant has <br />r;:quested to install Class V surface in the rear of the proposed building. While not generally <br />allowed by City Code, the size and weight of the equipment and machinery used in Dave Perkins <br />(?ontracting requires the use of Class V. The use of Class V materials is subject to City Council <br />al~prowtl. <br /> <br />Mr. Trudgcon stated the applicant will need to pave Limonite Street in order to gain access from <br />ii. and has been asked to submit a revised site plan and grading and drainage plan indicating the <br />intent to cto this work. Staff is requesting that sewer and water be installed as part of this road <br />construction, and there are still discussions on how this will take place. He explained the City of <br />Ramsey is paying for the sewer and water trunk and lateral fees and park dedication fees through <br />a business subsidy agreement as outlined in the Development Permit. The trail fee and <br />slormwater management fee are the responsibility of the developer. He advised the Planning <br />Corn mi ss ion recommended approval of the site plan, contingent upon the comments included in <br />the Staff Review Letter. The Chair of the Planning Commission asked the applicant, Dave <br />l'erkins, it' he found the letter acceptable, and Mr. Perkins indicated that he knew he was required <br />to pave file road, but he was not aware that it had to be paved with curb and gutter, according to <br />(:it3, stanclards. Itc indicated that he did not want to install curb and gutter, but that he would <br />work with City staff. Mr. Perkins plans now include the installation of curb and gutter. Mr. <br />Trudgcon advised that staff and the Planning Commission recommend site plan approval <br />conlingcnt upon compliance with City Staff Review Letter dated September 27, 2005, revised <br />October 19, 2005 and contingent upon the paving of Limonite Street, and the Developer signing <br />a l)evclopmcnt Permit with the City. <br /> <br />Assistant Public Works Director Olson indicated Mr. Perkins has stated he expects the cost of <br />c×tcnding sewer and water to be approximately $25,000. Staff would like direction from the <br />Council on how to proceed with this dollar amount, as it is not included in the business subsidy <br />agreement. Ite explained the issue is twofold. As staff was going through this site plan they <br />nolicecl there are two properties without sewer and water, which are the B and A Cylinder site <br />and lhc Kilt property. Those subdivisions would require extension of sewer and water. If B and <br />A Cylinder were to subdivide in the future with a north/south line there would be no other <br />possibility tbr the site to access sewer and water other than from Limonite Street. If the property <br />were to subdivide in an east/west direction it would not necessarily need water and sewer from <br />ISmonitc Street. However, in the absence of that decision the City needs to provide for sewer <br />and water down Limonite Street to plan for future subdivisions should that occur. <br /> <br />Mayor Gamec requested staff's input regarding Mr. Perkins not paying for the sewer and water <br />improvements. <br /> <br />City Council / October 25, 2005 <br /> Page 5 of 22 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.