Laserfiche WebLink
2023 PROPOSED <br />CV <br />F-. <br />O <br />O <br />O <br />c, <br />iiiiimiiiiiiiiiiiiimiiiiiimiiiiip <br />2022 Adopted <br />65% of permit fee <br />5.00 Minimum State Surcharge <br />Valuation based/1997 UBC Fee Table 1-A <br />Minimum of 23.50 <br />65% of permit fee <br />5.00 Minimum State Surcharge <br />50.00/per tent <br />100.00/per tank <br />100.00/per tank <br />100.00/per tank <br />O <br />O <br />kn <br />50.00 <br />O <br />O <br />N <br />350.00 <br />100.00 <br />2 x normal permit fee <br />Per Vendor Pricing <br />Per Vendor Pricing <br />Actual cost + 10% Admin fee <br />o <br />O <br />7r <br />300.00 <br />25.00 <br />500.00 <br />O <br />O <br />M <br />.E <br />E <br />© <br />© <br />O <br />© <br />M <br />O <br />O <br />N <br />45.00/visit <br />300.00/hr. per truck <br />hI <br />�' <br />O <br />O <br />O <br />enO <br />300.00/hr. per truck <br />O <br />O <br />U <br />O <br />O <br />el <br />10.00/transmission <br />5.00 min chg + 1.00/print <br />O <br />O"t <br />N <br />C) <br />O <br />O <br />- <br />.625/mile <br />95.00+15.00/Driveway, 20.00/Road Closing <br />+ $10,000 Bond per mile <br />L <br />E. <br />O <br />C <br />O <br />95.00\+.05/linear foot <br />SPECIAL NOTES <br />Effective 4-1-10 <br />ro <br />ter/ <br />W <br />Effective 4-1-10 <br />Reimbursements <br />Always follow IRS adopted rate <br />1 Street and Traffic Charges <br />Developer contribution: <br />SERVICE OR LICENSE <br />Plan Review <br />Fire Alarm Fees: <br />Permit <br />Plan Review <br />Temporary Assembly/Tent Permit(Greater than 100 sq. ft.) <br />Aboveground Tank Storage <br />Underground Tank Storage <br />Fuel Tank Storage Removal <br />Daycare Inspection Fee <br />Permit Re -Inspection Fee <br />Fireworks/Pyrotechnic Display Permit <br />Fireworks -Retail Sale Permit - Retailer only selling fireworks <br />Fireworks -Retail Sale Permit -All other retailers <br />Double Permit Fee <br />Lock Box Fee: <br />Surface Mount <br />Recessed Box <br />All Others <br />Fire Code Re -Inspection Fee <br />Gas Line Hit By Contractors <br />Open Burn Permits: <br />Open burn permit application <br />Open burn permit fire suppression escrow <br />Open burn permit fire suppression services <br />Illegal Burning <br />Subsequent Site Evaluations <br />Fire Service Fee: <br />Disaster Assistance <br />Ordinance Violations <br />Victim Service Fee <br />Letter of Good Standing <br />Photo CD <br />Photo Electronical Transfers <br />Photo Reprints <br />Vehicle Lockout <br />Vehicle Storage <br />Mileage/personal vehicle (IRS allowable rate) <br />C) <br />O <br />GA <br />g <br />Permit Fee - Boring/Open Trench <br />Boulevard Tree Replacement <br />Permit Fee - Overhead <br />