Laserfiche WebLink
W <br />2 <br />U <br />G <br />Z <br />N <br />W <br />W <br />LL <br />W W <br />Q <br />LL <br />W 0 <br />0w <br />> <br />H � <br />G <br />W <br />2 <br />0 <br />N <br />G <br />N <br />0 <br />0- <br />0 <br />a <br />2023 PROPOSED <br />0 <br />tri <br />7r <br />38.00/sq yard <br />0 <br />o <br />O <br />� <br />N <br />FEMA Rates <br />245.00 <br />35.00/account <br />6.00% <br />1,349.00 <br />0 <br />ri <br />.0 <br />O <br />4 <br />0 <br />o0 <br />. <br />0 <br />0 <br />N <br />01 <br />00 <br />534.00 <br />0 <br />- <br />elel <br />M <br />2022 Adopted <br />Developer Installed <br />25.00/sq yard <br />Price + Tax <br />Per Policy <br />1500.00 <br />74.00/Hr <br />0 <br />N <br />0 <br />O <br />N <br />0 <br />O <br />un <br />�-- <br />0 <br />O <br />un <br />N <br />0 <br />O <br />t <br />•.-- <br />30.00/account <br />0 <br />0 <br />v? <br />0 <br />0 <br />O <br />11.94/qtr <br />01 <br />75.89+3.16/1000 gal. <br />in excess of 20,000 gal. <br />O <br />M <br />r <br />3,933.00 <br />O• <br />N <br />O <br />• <br />00 <br />Per Connexus Energy Fee Schedule <br />Developer Installed <br />Per Connexus Energy Fee Schedule <br />294/light <br />C <br />- <br />C <br />`� <br />1.37/qtr <br />ram'' <br />a\ <br />G" <br />W <br />o <br />of <br />0 <br />• 0 <br />- <br />V i <br />0 <br />�— I <br />N <br />M <br />$43.20 Minimum <br />$2.96 per 1,000 for 15,001-25,000 <br />0 <br />0 <br />'7 <br />Oo <br />if:. <br />N <br />O <br />O <br />O <br />szu <br />O <br />M <br />$3.27 per 1,000 for 40,001-60,000 <br />$3.50 per 1,000 for 60,001-99,000 <br />$3.87 per 1,000 for 99,001-201,000 <br />SPECIAL NOTES <br />City Installed <br />Per Special Assessment Policy <br />Per FEMA Schedule of Equipment Rates <br />Traffic Sign Replacement (each) <br />O <br />U <br />C) <br />O <br />UTILITY RATES <br />Assessment Charge for Unpaid Items Assessed Administration fee <br />Based on 1-Year Treasury + 2 Points <br />Past due on current billing <br />Recycling Rates <br />Residential Curb -side Program fee/qtr Per Ace Contract <br />Sewer Rates <br />Per 2016 Comprehensive Sewer Study <br />based on national/local construction cost index 6/22 3.3% <br />based on national/local construction cost index 6/22 3.3% <br />based on national/local construction cost index 6/22 3.3% <br />based on national/local construction cost index 6/22 3.3% <br />Street Lights <br />based on national/local construction cost index 6/22 3.3% <br />based on national/local construction cost index 6/22 3.3% <br />Water Rates <br />Per 2012 & 2017 Comprehensive Water System Study <br />Conservation Rates <br />SERVICE OR LICENSE <br />street and/or traffic signs (each) <br />Bituminous Paving/Patching <br />t: <br />r--I <br />riV) <br />Road Improvement Assessment <br />Sidewalk Panel Removal and Replacement Escrow <br />Street Sweeping: Equipment Only: <br />Cigarette Sales (vending and over -the counter) <br />Cigarette Sales with age verification technology <br />E-Cigarette Sales <br />E-Cigarette Sales with age verification technology <br />Interest Rate on Unpaid Items Assessed <br />Penalty/late payment <br />Residential/Single dwelling usage fee/qtr <br />Multi-family(apt) & commercial usage fee/qtr <br />Connection charge/res. equivalent <br />Connection charge/acre comm./ind. <br />Lateral Benefit Charges: Residential <br />Lateral Benefit Charges: Commercial <br />Developer contribution: <br />installation of Cobra street light <br />traditionaire subdivision street light (w/100 ft of wire) <br />New ROW COR Lights <br />street light 0 & M 3 year @ $98/year <br />Residential billing: <br />urban subdivision street light rate per lot (>7/92) <br />rural subdivision street light rate per lot <br />priority street light rate per residential/apartment/ lot <br />1 Storm Water Management Rates <br />Residential <br />Commercial <br />Trunk charge/res. equivalent <br />Trunk charge/acre comm./ind. <br />Minimum usage fee/qtr <br />Quarterly Rate Structure <br />