My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 11/15/2022
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2022
>
Agenda - Public Works Committee - 11/15/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:39:02 AM
Creation date
11/10/2022 3:25:52 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
11/15/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Committee <br />Meeting Date: 11/15/2022 <br />Submitted For: Bruce Westby, Engineering/Public Works <br />By: Bruce Westby, Engineering/Public Works <br />Title: <br />Receive Updates on Improvement Projects, Studies and Items of Interest <br />6. 1. <br />Purpose/Background: <br />The purpose of this case is to update the Public Works Committee on current and proposed City, County and <br />MnDOT improvement projects and studies, and on other items of interest to the Committee. <br />City Improvement Projects <br />• 161st Avenue Reconstruction (IP #23-01) <br />o Staff is preparing plans and specifications <br />o Staff is coordinating design with PACT Charter school <br />o Staff applied for trail grant funding per Council approval <br />o 2023 construction proposed <br />• 167th Avenue Reconstruction (IP #23-04) <br />o Staff proposes to use Bolton & Menk to prepare plans and specs and evaluate regional trail alignment <br />and pedestrian crossings <br />o Staff applied for trail grant funding per Council approval <br />o 2023 construction proposed <br />• Sunwood Drive & Waco Street Reconstructions (IP #22-01) <br />o Construction complete e punch list mode <br />• Autumn Heights Street Reconstructions (IP #22-02) <br />• Construction complete e punch list mode <br />• 2022 Neighborhood Street Overlay Improvements (IP #22-04) <br />o Construction complete e punch list mode <br />• Riverdale Drive Trunk Utility Improvements (IP #22-05) <br />• Construction complete e punch list mode <br />• Wood Pond Hills 2nd, 3rd, 4th, 5th Street Reconstructions (IP #22-06) <br />o Construction complete e punch list mode <br />• 15410 Argon Street Drainage Improvements (IP #22-14) <br />• Construction in progress <br />• Highway 47 Sound Wall north of Xkimo Street (IP #22-17) <br />o See separate case on agenda <br />• WTP Trunk Watermain Improvements (#21-08) <br />• Plans are being revised to minimize project costs and include WTP commissioning improvements <br />(well -house valves, etc.) <br />• City Council will consider authorizing bids when plans are complete <br />• Centralized Water Treatment Plant (#21-09) <br />• New AE2S Project Manager is reviewing plans to ensure cost-effectiveness of design and materials <br />• Cost estimate will be updated after plans are complete <br />• City Council will consider authorizing bids on January 10, 2023 <br />• Ramsey Gateway Highway 10 Improvements (IP #20-11) <br />• Final design nearly complete <br />• Property/easement acquisitions in progress <br />• Construction anticipated 2023 through early 2026 (2024 - 2025 majority) <br />• Riverdale Drive east of SLB & temp US 10 widening Spring/Summer 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.