My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 11/15/2022
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2022
>
Agenda - Public Works Committee - 11/15/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:39:02 AM
Creation date
11/10/2022 3:25:52 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
11/15/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Riverdale Drive Extension — Llama Street to Bowers Drive (IP #20-05) <br />• Construction complete e punch list mode <br />• Wetland 114P Outlet Control Improvements (#19-07) <br />o See separate case on agenda <br />City of Anoka Improvement Projects <br />• Highway 47 Corridor Improvements <br />• Construction proposed for 2025 <br />• Anoka webpage https://clients.bolton-menk.com/anokahwy47/ <br />Anoka County Improvement Projects <br />• Roundabout at Armstrong Boulevard/CSAH 83 and Alpine Drive (IP #23-03) <br />o Anoka County received $1.35M in HSIP funds (est. project cost $1.5M) <br />o JPA includes City cost share of $28,667.64 <br />o Construction proposed for 2023 pending final City & County approvals <br />MnDOT Improvement Projects <br />• Anoka Solution Highway 10 Improvements <br />o Final completion Spring 2024 <br />o 2-lanes open for winter <br />o Anoka webpage https://clients.bolton-menk.com/hwv10/ <br />o MnDOT webpage http://www.dot.state.mn.us/metro/projects/hwv10-anoka/ <br />• US 10 / 169 & Ferry Street / TH 47 Interchange <br />o Final completion Spring 2024 <br />o MnDOT webpage http://www.dot.state.mn.us/metro/proiects/hwv10-anoka/ <br />• Ferry Street / Trunk Highway 47 Grade Separation @ BNSF Rail Crossing <br />o Preliminary design suspended to explore s-curve realignment <br />o $45M in bonds authorized October 2020 <br />o Construction proposed for 2024 or later <br />o Public Open House November 14th (MnDOT mailing attached) <br />o MnDOT webpage http://www.dot.state.mn.us/metro/projects/hwv47rr-anoka/ <br />• Rum River Bridge Replacement <br />• Final completion Spring 2024 <br />• Three lanes each direction <br />• MnDOT webpage http://www.dot.state.mn.us/metro/proiects/hwv10-anoka/ <br />Studies & Items of Interest <br />• Sunfish Lake Sedimentation Basin Improvements <br />o Property owner still interested in pursuing their request <br />o Staff will delineate rear property line this Fall <br />o Staff anticipates presenting an update in January <br />• CSAH 5 / Nowthen Boulevard Corridor Study <br />• Staff will present the final report when available <br />• Elk River Highway 10 Corridor Study <br />• Staff will present the final report when available <br />• Study website https://www.highwayl0corridorstudy.com/ <br />Timeframe: <br />Staff estimates up to 15 minutes will be needed for updates and discussion. <br />Observation s/Alternatives: <br />
The URL can be used to link to this page
Your browser does not support the video tag.