Laserfiche WebLink
PAY ESTIMATE NO: �0 ENGINEER <br />SUNWOOD DRIVE N.W. AND RHINESTONE STREET NW <br />0 <br />I wte: November 4, 2005 <br />I ionorable Mayor & City Council <br />�itv o1' Ramsey <br />L 1 73 Nowthen Blvd. NW <br />i?;+mscy, MN 55303 <br />1 ,: S!nnvood Drive NW and Rhinestone Street NW <br />C❑ntractor. Glenn Rchbein Companies <br />Crinlract Amount: $4,807,071.73* <br />lward Date: May 12, 2004 <br />Completion Date: October 15, 2005** <br />i icar Council Members: <br />fie following work has been completed on the above referenced project. <br />7Y,I I "A _ S A P 190-1 n.L117 _ ftun..,n,.d nri- NW - <br />hi"Eb1 <br />IT <br />O. <br />ITEM <br />QTY <br />UNIT <br />UNIT COST <br />CONTRACT <br />AMOUNT <br />USED TO. <br />DATE <br />EXTENSION - <br />1 <br />PAVEMENTMARKINGREMOVAL <br />5000 <br />LF <br />S0.41 <br />LF <br />$2,050.00 <br />5000 <br />$2.050.00 <br />2 <br />REMOVE DITUMINOUS PAVEMENT <br />800 <br />SY <br />S1.35 <br />SY <br />$1,080.00 <br />770 <br />$1,039.50 <br />SALVING BITUMINOUS PAVEMENT (FULL DEPTH) <br />1060 <br />LF <br />$0.93 <br />LF <br />1 $985.80 <br />666 <br />$619.38 <br />a <br />COMMON EXCAVATION. EV <br />15200 <br />CY <br />S1.96 <br />CY <br />S29,792.00 <br />15200 <br />$29.792.00 <br />5 <br />SALVAGED TOPSOIL FROM STOCKPILE. SV <br />2250 <br />CY <br />$6.60 <br />CY <br />S14,850.00 <br />1350 <br />$8,910.00 <br />6 <br />SUBGRADE PREPARATION <br />57 <br />RD. ST. <br />SI11.58 <br />RD.ST. <br />$6,360.06 <br />57 <br />$6.360.06 <br />SALVAGE .AND REINSTALL AGGREGATE SURFACE (LV) <br />620 <br />CY <br />$8.88 <br />CY <br />S5,505.60 <br />1320 <br />$11,721.60 <br />r <br />AGGREGATE BASE CLASS 5 MODIFIED <br />13000 <br />TON <br />S9.06 <br />TON <br />S117,780.00 <br />13198 <br />$119,573.88 <br />CONCRETT PAVEMENT <br />18500 <br />SY <br />S39.73 <br />SY <br />$735,005.00 <br />17145 <br />$681,170.85 <br />0 <br />INTEGRANT CURB DESIGN B624 <br />6800 <br />LF <br />$7.22 <br />LF <br />S49,096.00 <br />6612 <br />$47,738.64 <br />I <br />STAMPED COLORED CONCRETE PAVEMENT <br />1000 <br />SY <br />S86.48 <br />SY <br />$86,480.00 <br />847 <br />$73,248.56 <br />_12 <br />iYPE MV3 WEARING COURSE MIXTURE <br />2000 <br />TON <br />S37.00 <br />TON <br />$74,000.00 <br />1487.52 <br />$55,038.24 <br />_ <br />TYPE MV3 NON -WEARING COURSE MDCCURE <br />6550 <br />TON <br />S35.24 <br />TON <br />$230,822.00 <br />5240 <br />$184,657.60 <br />,I <br />B17JMINOIIS MATERIAL FOR TACK COAT <br />3100 <br />GAL <br />S2.17 <br />GAL <br />S6,727.00 <br />1825 <br />$3,960.25 <br />I)" RC PIPE: SEWER DESIGN 3006, CL5 <br />1017 <br />LF <br />S15.62 <br />LF <br />S15,885.54 <br />1017 <br />$15,885.54 <br />!t, <br />1%" RC PIPE SEWER DESIGN 3006, CL3 <br />895 <br />LF <br />$17.54 <br />LF <br />S15,698.30 <br />895 <br />$15,698.30 <br />2 1 " RC 111111; SEWER DESIGI4 3006. CL3 <br />885 <br />LF <br />S20.06 <br />LF- <br />S17,753.10 <br />724 <br />$14,523.44 <br />13 <br />24" RC PIPE SEWER DESIGN 3006, CL3 <br />1076 <br />LF <br />S22.00 <br />LF <br />$23,672.00 <br />810 <br />$17,820.00 <br />9 <br />27" RC PIPE SEWER DESIGN 3006, CL3 <br />442 <br />LF <br />S28.29 <br />LF <br />$12,504.18 <br />494 <br />$13,975.26 <br />20 <br />30" RC PIPF SEWER DESIGN 3006, CL3 <br />132 <br />LF <br />S33.40 <br />LF <br />$4,408.30 <br />- 131 <br />- $4,375.40 <br />1- <br />136" SPAN RC PIPE - ARCH CL IIA <br />16 <br />LF <br />$60.67 <br />LF <br />S970.72 <br />16 <br />$970.72 <br />3_;" It(,' PIPI: SEWER DESIGN 3006, CL3 <br />336 <br />LF <br />S39.66 <br />LF <br />$13,325.76 <br />336 <br />$13,325.76 <br />13r," <br />RC PIPE ;EWER DESIGN 3006, CL3 <br />37 <br />LF <br />S46.60 <br />LF <br />S1,724.20 <br />37 <br />$1.724.20 <br />24 I4d" <br />SPAN RC PIPE - ARCH CL IIA <br />"' RC. PIPE SEWER DESIGN 3006, CL3 <br />51 <br />206 <br />LF <br />LF <br />S73.61 <br />$63.91 <br />LF <br />LF <br />S3,754.11 <br />S13,165.46 <br />51 <br />90 <br />$3.754.11 <br />$5,751.90 <br />_n 15;" SP,\N RC PIPE - ARCH CL IIA <br />561 <br />LF <br />$88.69 <br />LF <br />S49,755.09 <br />560 <br />$49,666.40 <br />I58:" <br />SPAN RC PIPE - ARCH CL IIA <br />36 <br />LF <br />S99.18 <br />LF <br />$3,570.48 <br />36 <br />$3,570.48 <br />=3 JriU" <br />ftt' PIPE ;EWER DESIGN 3006, CL3 <br />92 <br />LF <br />$113.45 <br />LF <br />$10,437.40 <br />24 <br />$2,722.80 <br />I-,.cd Per C.O. Mi.'s 1, 3 and 4 <br />^ - 1t"' ed Po' C.O. Ne. 5 <br />_,.i ;h; tredD-/tduricgial/ARamsey/ <br />3 i71/ra3171 oaPAY ESTIMATE NO, 10 <br />PE-1 <br />-107- <br />