PAY ESTIMATE NO: �0 ENGINEER
<br />SUNWOOD DRIVE N.W. AND RHINESTONE STREET NW
<br />0
<br />I wte: November 4, 2005
<br />I ionorable Mayor & City Council
<br />�itv o1' Ramsey
<br />L 1 73 Nowthen Blvd. NW
<br />i?;+mscy, MN 55303
<br />1 ,: S!nnvood Drive NW and Rhinestone Street NW
<br />C❑ntractor. Glenn Rchbein Companies
<br />Crinlract Amount: $4,807,071.73*
<br />lward Date: May 12, 2004
<br />Completion Date: October 15, 2005**
<br />i icar Council Members:
<br />fie following work has been completed on the above referenced project.
<br />7Y,I I "A _ S A P 190-1 n.L117 _ ftun..,n,.d nri- NW -
<br />hi"Eb1
<br />IT
<br />O.
<br />ITEM
<br />QTY
<br />UNIT
<br />UNIT COST
<br />CONTRACT
<br />AMOUNT
<br />USED TO.
<br />DATE
<br />EXTENSION -
<br />1
<br />PAVEMENTMARKINGREMOVAL
<br />5000
<br />LF
<br />S0.41
<br />LF
<br />$2,050.00
<br />5000
<br />$2.050.00
<br />2
<br />REMOVE DITUMINOUS PAVEMENT
<br />800
<br />SY
<br />S1.35
<br />SY
<br />$1,080.00
<br />770
<br />$1,039.50
<br />SALVING BITUMINOUS PAVEMENT (FULL DEPTH)
<br />1060
<br />LF
<br />$0.93
<br />LF
<br />1 $985.80
<br />666
<br />$619.38
<br />a
<br />COMMON EXCAVATION. EV
<br />15200
<br />CY
<br />S1.96
<br />CY
<br />S29,792.00
<br />15200
<br />$29.792.00
<br />5
<br />SALVAGED TOPSOIL FROM STOCKPILE. SV
<br />2250
<br />CY
<br />$6.60
<br />CY
<br />S14,850.00
<br />1350
<br />$8,910.00
<br />6
<br />SUBGRADE PREPARATION
<br />57
<br />RD. ST.
<br />SI11.58
<br />RD.ST.
<br />$6,360.06
<br />57
<br />$6.360.06
<br />SALVAGE .AND REINSTALL AGGREGATE SURFACE (LV)
<br />620
<br />CY
<br />$8.88
<br />CY
<br />S5,505.60
<br />1320
<br />$11,721.60
<br />r
<br />AGGREGATE BASE CLASS 5 MODIFIED
<br />13000
<br />TON
<br />S9.06
<br />TON
<br />S117,780.00
<br />13198
<br />$119,573.88
<br />CONCRETT PAVEMENT
<br />18500
<br />SY
<br />S39.73
<br />SY
<br />$735,005.00
<br />17145
<br />$681,170.85
<br />0
<br />INTEGRANT CURB DESIGN B624
<br />6800
<br />LF
<br />$7.22
<br />LF
<br />S49,096.00
<br />6612
<br />$47,738.64
<br />I
<br />STAMPED COLORED CONCRETE PAVEMENT
<br />1000
<br />SY
<br />S86.48
<br />SY
<br />$86,480.00
<br />847
<br />$73,248.56
<br />_12
<br />iYPE MV3 WEARING COURSE MIXTURE
<br />2000
<br />TON
<br />S37.00
<br />TON
<br />$74,000.00
<br />1487.52
<br />$55,038.24
<br />_
<br />TYPE MV3 NON -WEARING COURSE MDCCURE
<br />6550
<br />TON
<br />S35.24
<br />TON
<br />$230,822.00
<br />5240
<br />$184,657.60
<br />,I
<br />B17JMINOIIS MATERIAL FOR TACK COAT
<br />3100
<br />GAL
<br />S2.17
<br />GAL
<br />S6,727.00
<br />1825
<br />$3,960.25
<br />I)" RC PIPE: SEWER DESIGN 3006, CL5
<br />1017
<br />LF
<br />S15.62
<br />LF
<br />S15,885.54
<br />1017
<br />$15,885.54
<br />!t,
<br />1%" RC PIPE SEWER DESIGN 3006, CL3
<br />895
<br />LF
<br />$17.54
<br />LF
<br />S15,698.30
<br />895
<br />$15,698.30
<br />2 1 " RC 111111; SEWER DESIGI4 3006. CL3
<br />885
<br />LF
<br />S20.06
<br />LF-
<br />S17,753.10
<br />724
<br />$14,523.44
<br />13
<br />24" RC PIPE SEWER DESIGN 3006, CL3
<br />1076
<br />LF
<br />S22.00
<br />LF
<br />$23,672.00
<br />810
<br />$17,820.00
<br />9
<br />27" RC PIPE SEWER DESIGN 3006, CL3
<br />442
<br />LF
<br />S28.29
<br />LF
<br />$12,504.18
<br />494
<br />$13,975.26
<br />20
<br />30" RC PIPF SEWER DESIGN 3006, CL3
<br />132
<br />LF
<br />S33.40
<br />LF
<br />$4,408.30
<br />- 131
<br />- $4,375.40
<br />1-
<br />136" SPAN RC PIPE - ARCH CL IIA
<br />16
<br />LF
<br />$60.67
<br />LF
<br />S970.72
<br />16
<br />$970.72
<br />3_;" It(,' PIPI: SEWER DESIGN 3006, CL3
<br />336
<br />LF
<br />S39.66
<br />LF
<br />$13,325.76
<br />336
<br />$13,325.76
<br />13r,"
<br />RC PIPE ;EWER DESIGN 3006, CL3
<br />37
<br />LF
<br />S46.60
<br />LF
<br />S1,724.20
<br />37
<br />$1.724.20
<br />24 I4d"
<br />SPAN RC PIPE - ARCH CL IIA
<br />"' RC. PIPE SEWER DESIGN 3006, CL3
<br />51
<br />206
<br />LF
<br />LF
<br />S73.61
<br />$63.91
<br />LF
<br />LF
<br />S3,754.11
<br />S13,165.46
<br />51
<br />90
<br />$3.754.11
<br />$5,751.90
<br />_n 15;" SP,\N RC PIPE - ARCH CL IIA
<br />561
<br />LF
<br />$88.69
<br />LF
<br />S49,755.09
<br />560
<br />$49,666.40
<br />I58:"
<br />SPAN RC PIPE - ARCH CL IIA
<br />36
<br />LF
<br />S99.18
<br />LF
<br />$3,570.48
<br />36
<br />$3,570.48
<br />=3 JriU"
<br />ftt' PIPE ;EWER DESIGN 3006, CL3
<br />92
<br />LF
<br />$113.45
<br />LF
<br />$10,437.40
<br />24
<br />$2,722.80
<br />I-,.cd Per C.O. Mi.'s 1, 3 and 4
<br />^ - 1t"' ed Po' C.O. Ne. 5
<br />_,.i ;h; tredD-/tduricgial/ARamsey/
<br />3 i71/ra3171 oaPAY ESTIMATE NO, 10
<br />PE-1
<br />-107-