My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/22/2005
Ramsey
>
Public
>
Agendas
>
Council
>
2005
>
Agenda - Council - 11/22/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 2:00:09 PM
Creation date
11/18/2005 2:16:50 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/22/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PAY ESTIMATE NO. ,10 ENGINEER <br />SUNWOOD DRIVE N.W. AND RHINESTONE STREET NW <br />Bid Schedule "A" -S A P 199-104-07 - Sunwood Drive NW Continued <br />ITEM <br />NG <br />ITEM <br />QTY <br />UNIT <br />UNIT COST <br />CONTRACT <br />AMOUNT <br />USED TO- <br />DATE <br />EXTENSION <br />29 <br />73" SPAN RC PIPE - ARCH CL IIA <br />181 <br />LF <br />$134.11 <br />LF <br />$24,273.91 <br />178 <br />$23.871.58 <br />30 <br />72" RC PIPE SEWER DESIGN 3006. CL3 <br />149 <br />LF <br />S162.26 <br />LF <br />S24,014.48 <br />148 <br />$24,014.48 <br />31 <br />99" SPAN RC PIPE - ARCH CL IIA <br />16 <br />1 LF <br />S179.36 <br />LF <br />S2.369.76 <br />16 <br />$2,869,76 <br />32 <br />18" PVC PLUG <br />I <br />EACH <br />S110.00 <br />EACH <br />$110.00 <br />$0.00 <br />33 <br />15" PIPE PLUG <br />I <br />EACH <br />$80.00 <br />EACH <br />S80.00 <br />1 <br />$80.00 <br />34 <br />18" PIPE PLUG <br />3 <br />EACH <br />S35.00 <br />EACH <br />$105.00 <br />3 <br />$105.00 <br />35 <br />2V PIPE PLUG <br />2 <br />EACH <br />$40.00 <br />EACH <br />$80.00 <br />2 <br />$80.00 <br />36 <br />27" PIPE PLUG <br />2 <br />EACH <br />S50.00 <br />EACH <br />$100.00 <br />2 <br />$100.00 <br />37 <br />44" SPAN ARCH PIPE PLUG <br />I <br />EACH <br />S150.00 <br />EACH <br />5150.00 <br />1 <br />$150.00 <br />38 <br />42" PIPE PLUG <br />2 <br />EACH <br />$I00.00 <br />EACH <br />S200.00 <br />1 <br />$100.00 <br />39 <br />60." PIPE PLUG <br />I <br />EACH <br />1 $200.00 <br />EACH <br />S200.00 <br />$0.00 <br />40 <br />73" SPAN ARCH PIPE PLUG <br />2 <br />EACH <br />S350.00 <br />EACH <br />5700.00 <br />1 <br />$350.00 <br />41 <br />72" PIPE PLUG <br />2 <br />EACH <br />S300.00 <br />EACH <br />S600.00 <br />2 <br />$600.00 <br />42 <br />88" SPAN ARCH PIPE PLUG <br />I <br />EACH <br />S400.00 <br />EACH <br />S400.001 <br />$0,00 <br />43 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 - 4020 <br />108 <br />LF <br />S 162.69 <br />LF <br />S17,570.52 <br />90.59 <br />$14,738.09 <br />44 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 54 .4020 <br />32 <br />LF <br />S205.91 <br />LF <br />S6,589.12 <br />24.96 <br />$5,139.51 <br />45 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 60 - 4020 <br />19 <br />LF <br />S274.42 <br />LF <br />SS 213.98 <br />20.22 <br />$6 548.77 <br />46 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 72 .4020 <br />13 <br />LF <br />$320.29 <br />LF <br />S4,163.64 <br />25.89 <br />$8.292.05 <br />47 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 84 .4020 <br />12 <br />LF . <br />S470.83 <br />LF <br />S5,649.96 <br />10 <br />$4,708.3 <br />48 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 90 - 4020 <br />5 <br />LF <br />$648.12 <br />LF <br />S3,240.60 <br />0 <br />$0.00 <br />49 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 96 -4020 <br />13 <br />LF <br />$598.38 <br />LF <br />$7,778.94 <br />36.49 <br />$21,834.89 <br />50 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 108 • 4020 <br />50 <br />LF <br />S728.15 <br />LF <br />S36,407.50 <br />48.87 <br />$35,584.69 <br />51 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 120 - 4020 <br />20 <br />LF <br />S1,032.36 <br />LF <br />$20.647.20 <br />19.86 <br />$20,502.67 <br />52 <br />CASTING ASSEMBLIES SPECIAL <br />49 <br />EACH <br />$479.25 <br />EACH <br />S23,483.25 <br />49 <br />$22,483.25 <br />53 <br />CASTING ASSEMBLIES A-7D <br />4 <br />EACH <br />S546.J3 <br />EACH <br />$2,184.52 <br />3 <br />$1,638.39 <br />54 <br />CASTING ASSEMBLIES M-11 <br />2 <br />EACH <br />$564.45 <br />EACH <br />S1.128.90 <br />2 <br />$1,128.90 <br />55 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 1 <br />12 <br />EACH <br />S376.58 <br />EACH <br />S4,518.96 <br />10 <br />$3,765,80 <br />56 <br />CONCRETE CURB AND GUTTER DESIGN B424 <br />1040 <br />LF <br />S8.88 <br />LF <br />$9 235.20 <br />1040 <br />$9.235.20 <br />57 <br />SIGN PANELS TYPE C <br />316 <br />SF <br />S22.19 <br />SF <br />S7,012.04 <br />100 <br />$2,219.00 <br />58 1CONCRETE <br />CURB AND GUTTER DESIGN B618 <br />4700 <br />LF <br />$7.59 <br />LF <br />S35,673.00 <br />2371 <br />$17,995.89 <br />59 <br />PEDESTRIAN CURB RAMP <br />2 <br />EACH <br />S319.92 <br />EACH <br />S639.84 <br />2 <br />$639.84 <br />0 <br />0 <br />G J S h a r e d D o cs/M u n i ci p a VA R a m s e y/ <br />3171/ra3171pBPAY ESTIMATE NO. 10 <br />•i <br />PE-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.