Laserfiche WebLink
PAY ESTIMATE NO.. 10 ENGINEER <br />SUNWOOD DRIVE N.W. AND RHINESTONE STREET NW <br />11 <br />Hid .9c1 <br />ITEM <br />I YO. <br />61, <br />62 <br />f 63 <br />64 <br />ITEM <br />QTY <br />UNIT <br />UNIT COST <br />CONTRACT <br />AMOUNT <br />USED TO - <br />DATE <br />EXTENSION <br />F I Si n I'anel Typo "D" <br />7 <br />EACH <br />S258.00 <br />EACH <br />$1,806.00 <br />$0.00 <br />TYPE III HARRIDADE <br />I I <br />EACH <br />5309.60 <br />EACH <br />13,405.60 <br />2 <br />$619.20 <br />(PAVEMENT MESSAGE (ONLY) POLY PREFORMED <br />32 <br />EACH <br />I S387.00 <br />EACHI <br />S12,384.00 <br />$0.00 <br />�PAVFMENT MESSAGE (RR CROSSING) PAINT <br />2 <br />EACH <br />S159.96 <br />EACH <br />$319.92 <br />1 <br />$159.96 <br />tPP.VEMFN'T MESSAGE (COMBINATION ARROW PAINT <br />IPAVEMENT MESSAGE (RIGHT ARROW) POLY PREFORMED <br />PAVEMENT MESSAGE (LEFT ARROW) POLY PREFORMED <br />4 <br />12 <br />28 <br />EACH <br />EACH <br />EACH <br />$82.56 <br />$309.60 <br />S309.60 <br />EACH <br />EACH <br />EACH <br />- $330.24 <br />$3.715.20 <br />S8,668.80 <br />2 <br />9 <br />16 <br />- $165.12 <br />$2,786,40 <br />$4,953.60 <br />I!" BI:OKFN LINE YELLOW EPDXY <br />200 <br />LF <br />$0.51 <br />LF <br />$102.00 <br />5064 <br />$2,582.64 <br />�," SOLID LINE WHITE- EPDXY <br />125DO <br />LF <br />$0.50 <br />LF <br />$6,250.00 <br />10208 <br />$5,104.00 <br />4" BROKEN LINE WHITE- EPDXY <br />3150 <br />LF <br />$0.50 <br />LF <br />S1,575.00 <br />1425 <br />$712.50 <br />24" STOP LINE WHITE - EPDXY <br />900 <br />LF <br />$7.22 <br />LF <br />S5,776.00 <br />$0.00 <br />6" SOLID LINE WHITE - EPDXY <br />1100 <br />LF <br />$9.67 <br />LF <br />$9,537.00 <br />$0.00 <br />4" DOUBLE SOLID LINE YELLOW --EPDXY <br />7350 <br />LF <br />S1.01 <br />LF <br />$7,423.50 <br />6252 <br />$6,314.52 <br />24" SOLID LINE YELLOW - EPDXY <br />1670 <br />LF <br />$5.68 <br />LF <br />$9,495.60 <br />496 <br />$2,817.28 <br />LINE WHITE - PAINT <br />3000 <br />LF <br />S0.41 <br />LF <br />$1 230.00 <br />725 <br />$297.25 <br />L4':SO[,ID <br />JBLE SOLID LINE YELLOW - PAINT <br />2300 <br />LF <br />S0.83 <br />LF <br />S1,909.00 <br />$0.00 <br />�1" SOLID LINE YELLOW - PAINT <br />330 <br />LF <br />$2.53 <br />LF <br />$851 40 <br />0 <br />$0.00 <br />PiMC LOOP DEl'ECTOR 6' X 6' <br />43 <br />EACH <br />S485.04 <br />EACH <br />S20,856.72 <br />42 <br />$20.371.68 <br />PVC HANDHOLE (METAL FRAME AND COVER) <br />23 <br />EACH <br />S567.60 <br />EACH <br />$13,054.80 <br />21 <br />$11,919.60 <br />RISTALL 4"-6" PVC (SCH 40) CONDUIT <br />2400 <br />IF <br />S6.45 <br />LF <br />S15,480.00 <br />6244 <br />$40,273.80 <br />�F & 1 4" RIGID STEEL CONDUIT <br />430 <br />LF <br />S21.18 <br />LF <br />$10,827.40 <br />430 <br />$10,827.40 <br />LALE CHECK <br />200 <br />. EACH <br />S1 L87 <br />EACH <br />S2,374.00 <br />$0.00 <br />SILT FF-NCE TYPEMACHINE SLICED <br />L000 <br />LF <br />$1.81 <br />LF <br />S1,310.00 <br />$0.00 <br />TiiMPORARY CONSTRUCTION ROCK ENTRANCE <br />2 <br />EACH <br />S2,412.51 <br />EACH <br />$4,825.02 <br />2 <br />$4,825.02 <br />SEEDING <br />3.0 <br />ACRE <br />5258.00 <br />ACRE <br />S774.00 <br />0 <br />$0.00 <br />SoDUING, .i CPE LAWN <br />5000 <br />SY <br />S2.48 <br />SY <br />S12 400.00 <br />766 <br />$1,904.64 <br />SFED MIXTURE 260 <br />300 <br />LB <br />S2.63 <br />LB <br />S789.00 <br />$0.00 <br />(MULCH MATERIAL TYPE 3 <br />6 <br />TON <br />5154.30 <br />TON <br />1 $928.80 <br />$0.00 <br />-vosioN CONTROL BLANKETS CATEGORY 3 <br />100 <br />SY <br />SL55 <br />SY <br />S155.00 <br />$0.00 <br />I,(-C)MMHRCIAL FERTILIZER ANALYSIS 24-2-24 <br />1200 <br />LBS <br />$0.36 <br />LBS <br />S432.00 <br />$0.00 <br />I''&d Bid ;chcdulc "A" <br />S 1,95 1,654.92 $1,735,055.54 <br />,. Sharutl Doc;/Mun,opaVA Iiamsey/ <br />31711ra3171pePAY <_ ,TIMATE NO. 10 <br />PE-3 <br />-109- <br />