Laserfiche WebLink
PAY ESTIMATE NO, 10 ENGINEER <br />SUNWOOD DRIVE N.W. AND RHINESTONE STREET NW <br />C <br />=.;d ¢ichimdule " "' - S.A.P. 199-109-01 - Rhinestone Street NW <br />NO <br />ITEM <br />QTY <br />UNIT <br />UNIT COST <br />CONTRACT <br />AMOUNT <br />USED TO - <br />DATE <br />EXTENSION <br />182 <br />jPAVFMENTMARKINGREMOVAL <br />4800 <br />LF <br />$0.41 <br />LF <br />51,968.00 <br />4800 <br />$1,968.00 <br />183 <br />1SAWING BITUMINOUS PAVEMENT (FULL DEPTH) <br />400 <br />LF <br />$0.93 <br />LF <br />S372.00 <br />$0.00 <br />Ift4 (COMMON EXCAVATION. EV <br />3000 <br />CY <br />I S1.96 <br />CY <br />1 S5,880.00 <br />3000 <br />$5,880.00 <br />1%5 ;SALVAGED TOPSOIL FROM STOCKPILE, SV <br />700 <br />CY <br />S6.60 <br />CY - <br />$4,620.00 <br />$0.00 <br />186 <br />iSUBGWIDE PREPARATION <br />26 <br />RD. ST. <br />S111.58 <br />RD. ST. <br />$2,901.08 <br />16 <br />$1.785.28 <br />I S' <br />AGGREc r,, rE BASE CLASS 5 MODIFIED <br />1500 <br />TON <br />$9.06 <br />TON <br />S13,590.00 <br />2075 <br />$18,799.50 <br />88 <br />CONCRETE PAVEMENT <br />3100 <br />1 SY <br />$39.73 <br />SY <br />$123,163.00 <br />3100 <br />$123,163A0 <br />lX9 <br />INTEGRANT CURB DESIGN B624 <br />1400 <br />LF <br />S7.22 <br />LF <br />$10,108.00 <br />1256 <br />$9.068.32 <br />190 <br />STAMPED COLORED CONCRETE PAVEMENT <br />110 <br />SY <br />$86A8 <br />SY <br />$9,512.80 <br />110 <br />$9,512.80 <br />191 <br />TYPF. MV3 WEARING COURSE MIXTURE <br />700 <br />TON <br />$37.00 <br />TON <br />- $25,900.00 <br />44774 <br />$16,566.38 <br />'1YPE MV3 NON -WEARING COURSE MIXTURE <br />950 <br />TON <br />S35.24 <br />TON <br />S33,478.00 <br />959.96 <br />$33.826.99 <br />_9! <br />BITUMINOUS MATERIAL FOR TACK COAT <br />300 <br />GAL <br />$2.17 <br />GAL <br />$651.00 <br />300 <br />$651.00 <br />9-4- <br />15" RC P1pE SEWER DESIGN 3006, CL5 <br />510 <br />LF <br />S15.62 <br />LF <br />$7,966.20 <br />463 <br />$7,232.06 <br />9' <br />8" RC PIPE SEWER DESIGN 3006, CL3 <br />32 <br />LF <br />$17.54 <br />LF <br />$561 28 <br />32 <br />$561.28 <br />i91" <br />RC PIPF, SEWER DESIGN 3006, CL3 <br />170 <br />LF <br />$20.06 <br />LF <br />$3,410.20 <br />171 <br />$3,430.26 <br />, <br /><4" Rc, PIPF SEWER DESIGN 3006, CL3 <br />24 <br />LF <br />$22.00 <br />LF <br />$528.00 <br />41 <br />$902.00 <br />_INF, <br />;7- RC PIPE SEWER DESIGN 3006, CL3 <br />368 <br />LF <br />$28.29 <br />LF <br />SI0,410.72 <br />318 <br />$8.996.22 <br />199 <br />30" RC PIPE SF,WER DESIGN 3006. CL3 <br />92 <br />LF <br />$33.40 <br />LF <br />$3,072.80 <br />89 <br />$2,972.60 <br />00 <br />42" RC PIPE SEWER DESIGN 3006. CL3 <br />382 <br />LF <br />S63.91 <br />LF <br />$24,413.62 <br />375 <br />$23,966.25 <br />4K" RC PIPE SEWER DESIGN 3006, CL3 <br />31 <br />LF <br />$77.38 <br />LF <br />- S2,398.78 <br />34 <br />$2,630,92 <br />SPAN RC PIPE .ARCH CL IIA <br />701 <br />LF <br />S99.18 <br />LF <br />$69,525.18 <br />436 <br />$43.242A8 <br />_1102158" <br />203 I5.1" <br />RC PIPE SEWER DESIGN 3006, CL3 <br />125 <br />LF <br />$97.36 <br />LF <br />$L2,170A0 <br />125 <br />$12,170,00 <br />ao4 f <br />60" RC PIPF SEWER DESIGN 3006, CL3 <br />361 <br />LF <br />S113.45 <br />LF <br />S40,955.45 <br />361 <br />$40,955,45 <br />- -r <br />2n5 <br />CONNECT "I'O EXISTING STORM SEWER <br />1 <br />EACH <br />$330.55 <br />EACH <br />$330.55 <br />I <br />$330.55 <br />?06 <br />1"' PIPF. PLLJ(i <br />2 <br />EACH <br />S65.00 <br />EACH <br />S130.00 <br />2 <br />$130.00 <br />;I,- <br />18" PIPE K LJ(i <br />1 <br />EACH <br />$65.00 <br />EACH <br />$65.00 <br />1 <br />$65.00 <br />08 <br />21" PIPF t'LUG <br />2 <br />EACH <br />S75.00 <br />EACH <br />$150.00 <br />3 - <br />$225.00 <br />209 I2"" <br />PIPE PLUG <br />2 <br />EACH <br />S85.00 <br />EACH <br />S170.00 <br />1 <br />$85.00 <br />2i0 142" <br />PIPE PLUG <br />1 <br />EACH <br />$125.00 <br />EACH <br />S125.00 <br />$0.00 <br />I �5 " SPAN KC PIPE ARCH1 <br />60" PIP!- PLIJ(3 <br />1 <br />EACH <br />EACH <br />$300.00 <br />$250.00 <br />EACH <br />EACH <br />$300.00 <br />$250.00 <br />$O.00 <br />$0.00 <br />i5haren Docs/MuniapaVARemsey/ <br />3.7'dr 217 i p.PAY ESTIMATE NO. 10 <br />PE-7 <br />-113- <br />