My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/22/2005
Ramsey
>
Public
>
Agendas
>
Council
>
2005
>
Agenda - Council - 11/22/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 2:00:09 PM
Creation date
11/18/2005 2:16:50 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/22/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PAY ESTIMATE NO..10 ENGINEER <br />SUNWOOD DRIVE N.W. AND RHINESTONE STREET NW <br />is <br />tam ocneritne <br />ITEM <br />NO. <br />L • o.n.r. ........... <br />ITEM <br />QTY <br />UNIT <br />UNIT COST <br />CONTRACT <br />USED TO- <br />DATE <br />EXTENSION <br />-AMOUNT <br />213 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 - 4020 <br />49 <br />LF <br />5144.55 <br />LF <br />57,082,95 <br />43 <br />$6.215.65 <br />214 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 54 - 4020 <br />- 11 <br />LF <br />5202. 8 <br />LF <br />52,228.38 <br />I I <br />52,228.38 <br />215 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 60 -4020 <br />10 <br />LF <br />3240.94 <br />LF <br />52,409.40 <br />10 <br />$2,409.40 <br />216 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 66 - 4020 <br />8 <br />LF <br />5284.46 <br />LF <br />52.275.66 <br />12.7 <br />$3,612.64 <br />217 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 72 - 4020 <br />12 <br />LF <br />5355.03 <br />LF <br />54.260.36 <br />12 <br />$4,260:36 <br />219 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 78 - 4020 <br />19 <br />LF <br />5354.94 <br />LF <br />56,743.86 <br />0 <br />$0,00 <br />219 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 84 - 4020 <br />7 <br />LF <br />5456.75 <br />LF <br />53,197,25 <br />17.3 <br />$7,901.78 <br />220 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 96 -4020 <br />40 <br />LF <br />$544.76 <br />LF <br />MI,790.40 <br />40 <br />$21,790,40 <br />221 <br />CASTING ASSEMBLIES SPECIAL <br />30 <br />1 EACH <br />5479.25 <br />EACH I <br />514.377.50 <br />31) <br />$14,377.50 <br />222 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 1 <br />6 <br />EACH <br />5376.58 <br />EACH <br />52,259.48 <br />6 <br />$2,259.48 <br />223 <br />4" CONCRETE WALK <br />23000 <br />SF <br />52.01 <br />SF <br />$46,230.00 <br />3960 <br />$7,959.60 <br />224 <br />6" CONCRETE WALK <br />2500 <br />SF <br />54.33 <br />SF <br />$10,825.00 <br />$0.00 <br />225 <br />CONCRETE CURB AND GUTTER DESIGN B6IS <br />2430 <br />LF <br />57.59 <br />LF <br />$18,443.70 <br />2140 <br />$16.242.60 <br />226 <br />PEDESTRIAN CURB RAMP <br />24 <br />EACH <br />5319.92 <br />EACH <br />57,678.08 <br />8 <br />$2,559.36 <br />227 <br />SIGN PANELS TYPE C <br />188.5 <br />SF <br />$22.19 <br />SF <br />54.182.82 <br />$0.00 <br />228 <br />PAVEMENT MESSAGE (ONLY) EPDXY <br />4 <br />EACH <br />5200,00 <br />EACH <br />5800.00 <br />$0.00 <br />229 <br />PAVEMENT MESSAGE (RIGHT ARROW) EPDXY <br />3 <br />EACH <br />S144A_3 <br />EACH <br />S43344 <br />3 <br />$433.4 <br />230 <br />PAVEMENTMESSAGE (LEFT ARROW) EPDXY <br />5 <br />EACH <br />S144.48 <br />EACH <br />$722.40 <br />5 <br />$722.4 <br />231 <br />F & I SIGN PANELS TYPE "D" <br />3 <br />EACH <br />5258.00 <br />EACH <br />$774,00 <br />$0.00 <br />232 <br />4" SOLID LINE WHITE - PAINT <br />1850 <br />LF <br />50.41 <br />LF <br />5758.50 <br />$0.00 <br />233 <br />24" SOLID LINE WHITE - PAINT <br />20 <br />LF <br />$3.87 <br />LF <br />577.40 <br />26 <br />$100.62 <br />234 <br />36" SOLID LINE WHITE • PAINT <br />50 <br />LF <br />55.6E <br />LF <br />5284.00 <br />30.00 <br />235 <br />4" BROKEN LINE YELLOW - PAINT <br />150 <br />LF <br />50.42 <br />LF <br />563.00 <br />761 <br />$319.62 <br />236 <br />4" DOUBLE SOLID LINE YELLOW - PAINT <br />1150 <br />LF <br />50.85 <br />LF <br />5977.50 <br />$0.00 <br />237 <br />24" SOLID LINE YELLOW . PAINT <br />180 <br />LF <br />52.5E <br />LF <br />S464.40 <br />33 <br />$85.74 <br />238 - <br />4" SOLID LINE WHITE • EPDXY <br />4100 <br />LF <br />50,50 <br />LF <br />52,050.O0 <br />4100 <br />$2,050,00 <br />239 <br />24" STOP LINE WHITE - EPDXY <br />300 <br />LF <br />57.22 <br />LF <br />52,166.00 <br />135 <br />$974.70 <br />240 <br />36" SOLID LINE WHITE • EPDXY <br />570 <br />LF <br />58.67 <br />LF <br />54,941.90 <br />. $0.00 <br />241 <br />4" BROKEN LINE YELLOW - EPDXY <br />1800 <br />LF <br />50.51 <br />LF <br />5918.00 <br />260 <br />5132.60 <br />242 <br />4" DOUBLE SOLID LINE YELLOW • EPDXY <br />600 <br />LF <br />I 51.Ot <br />LF <br />$606.00 <br />600 <br />$606.00I <br />243 <br />24" SOLID LINE YELLOW - EPDXY <br />50 <br />LF <br />$5.68 <br />LF <br />5284.00 <br />50 <br />5284.DO <br />244 <br />INSTALL 4"-6" PVC (SCH 40) CONDUIT- <br />1000 <br />LF <br />56,45 <br />LF <br />56.450.00 <br />IOOD <br />$6,450.001 <br />• <br />G:/Shared0ocz/MunimpaVARemsey/ <br />31711ra3171pePAY ESTIMATE NO. 10 <br />-i 14- <br />PE-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.