Laserfiche WebLink
PAY ESTIMATE NO. 10 <br />SUNWOOD DRIVE N.W. AND RHINESTONE STREET NW <br />ENGINEER <br />Bid Sch.dule "D" - Rhinestone Street NW Local Funding Continued <br />PEhI <br />QTY <br />UNIT <br />UNIT COST <br />CONTRACT <br />AMOUNT <br />USEDTOITEM <br />DATE <br />EXTENSION <br />,oa �4" DOUBLE: SOLID LINE YELLOW -PAINT <br />(I50 <br />LF <br />$0.85 <br />LF <br />$977.50.. <br />$0.00 <br />305 i24" SOLID LINE YELLOW - PAINT <br />180 <br />LF <br />S2.58 <br />LF <br />S464.40 <br />$0.00 <br />-or; SEEDING <br />0.1 <br />ACRE <br />3774.00 <br />ACRE <br />1 $77.40 <br />$p pp <br />30'SEED <br />MIXTURE 260 <br />10 <br />LB <br />$7.89 <br />LB <br />$78.90 <br />$0.00 <br />A1H <br />IMIJLCH IMIATEPIAL TYPE 3 <br />0-- <br />TON <br />- $464.40 <br />TON <br />- S92.88 <br />S0.00 <br />109 <br />EROSION CONTROL BLANKETS CATEGORY 3 <br />100 <br />SY <br />$2.32 <br />SY <br />$232.00 <br />$0.00 <br />310 (COMMERCIAL <br />FERTILIZER ANALYSIS 24-2-24 <br />40 <br />LBS <br />S1.08 <br />LBS <br />$43.20 <br />$0.00 <br />.imal Did Schedule "D" <br />---- „G„ _ n�,.r.:r....r..... -r...rr... r,.....,.i —d a:.IA Mr.— <br />S302.999.21 S263,831. I8 <br />rPf:M <br />I <br />ITEM <br />QTY <br />UNIT <br />UNIT COST <br />CONTRACT <br />USED TO - <br />EXTENSION <br />o. <br />I_ <br />AMOUNT <br />DATE <br />I' <br />_ <br />MOBILIZATION <br />I <br />LS <br />$135,140.80 <br />LS <br />S185,140.80 <br />0.8 <br />$148,112.64 <br />2 <br />FIELD OFFICE TYPE D <br />1 <br />LS <br />$5,397.41 <br />LS <br />$5.397.41 <br />1 <br />$5,397.41 <br />_I <br />TR WFIC CONTROL <br />I I <br />LS 1 <br />$12,384.00 <br />LS <br />$12,384.001 <br />1 <br />$12,384.00 <br />Twrl Bid Sehelllde "E" <br />C;han�e Order No. I <br />ITEM <br />E- <br />L:` — <br />$202,922.21 $165,894.05 <br />1n" <br />ITEM <br />QTY <br />UNIT <br />UNIT COST <br />CONTRACT <br />AMOUNT <br />USED TO - <br />DATE <br />EXTENSION <br />CLOSE SHOULDER ON RAMSEY BLVD. <br />1 <br />LS <br />S 1,650.00 <br />LS <br />S 1,650.00 <br />1 <br />S1,650.00 <br />SANI'lARY SEWER CONNECTIONS <br />2 <br />EACH <br />S 1,000.00. <br />EACH <br />S 2.000.00 <br />2 <br />$2,000.00 <br />UEWATERING FOR CROSSING RAMSEY BLVD. <br />11, <br />S 3,500.00 <br />LS <br />S 3,500.00 <br />I <br />1 $3,500.00 <br />Y_XI.STING SEWAGE BYPASS/PUMPING <br />l <br />LS <br />S 1.500.00 <br />LS <br />S 1,500.00 <br />I <br />$1,500.00 <br />C']45 F'Vr' SDR•25 PIPE (14-16" <br />90 <br />LF <br />$ 91.08 <br />LF <br />S 8,197.20 <br />90 <br />58,197.20 <br />[ ,'A i.hauge Ordcr!!1 <br />C`L:aigr Order No. J <br />0 <br />S 16,847,20 $ 16,847.20 <br />ITEM <br />QTY <br />UNIT <br />UNIT COST <br />CONTRACT <br />AMOUNT <br />USED TO - <br />DATE <br />EXTENSION <br />STANIPED COLORED CONCRETE PAVEMENT <br />260 <br />FSY <br />S 86.48 <br />Sy <br />S - 22.484.30 <br />10 <br />S864.80 <br />rota[ !;han gc Order 03 <br />$ 22.484,30 $864.30 <br />lSh%iredUuc5lMunicipal/ARamsey/ <br />1 718a3171 P.PAY ESTIMATE NO. 10 <br />PE-11 <br />-117- <br />