My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/22/2005
Ramsey
>
Public
>
Agendas
>
Council
>
2005
>
Agenda - Council - 11/22/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 2:00:09 PM
Creation date
11/18/2005 2:16:50 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/22/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�C�Oj �1`j�� fN'`EXUS <br />L1 `FL 1L71 <br />Your Community Energy mariner <br />Mr. Pete Raatikka <br />Hakanson - Anderson <br />3601 Thurston Ave <br />Anoka, MN 55303 <br />Dear Mr. Raatikka, <br />14601 Ramsey Boulevard <br />Ramsey, Minnesota 55303 <br />763-3232600 <br />Fax: 763-506.9541 <br />1.800.642-1672 <br />www.connexusenergy.com <br />info@connexusenergy.com <br />November 15, 2005 <br />I have prepared the following estimate to install lighting fixtures in the pedestrian <br />underpass at County Road 47. In addition to the initial installation, Connexus Energy <br />will provide ongoing maintenance of the lights under our Energy and Maintenance rate. <br />A licensed electrician contracted by Connexus Energy is providing a portion of the <br />installation shown below. <br />Scope Of Work: <br />• Provide overhead 7.5KVA transformer <br />Provide electrical feed for 120 volt service to a lighting control pedestal to <br />feed lighting fixtures inside the pedestrian tunnel <br />Install 5 100 watt vandal proof metal halide light fixtures in the tunnel <br />Total <br />$5,530.00 <br />The cost shown above includes an additional $550 for a transformer that was not <br />included in my original estimate. These installation costs are based upon our best <br />practices. If jeb site conditions beyond our control prevent normal installation <br />procedures, additional charges may be applied. The costs shown above are based on <br />summer construction and do not include winter charges for work provided during winter <br />conditions. <br />I hope that this information is satisfactory for you. Do not hesitate to contact me if you <br />have any questions. <br />Sincerely, <br />D <br />Leo <br />Offerman. <br />Leo Offerman Accepted by: <br />Utility Services Representative <br />• <br />• <br />-310- <br />
The URL can be used to link to this page
Your browser does not support the video tag.