My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Public Works Committee - 10/18/2022
Ramsey
>
Public
>
Minutes
>
Public Works Committee
>
2022
>
Minutes - Public Works Committee - 10/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:49:47 PM
Creation date
11/18/2022 12:45:29 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Public Works Committee
Document Date
10/18/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
work would be completed within the project timeline. Chairperson Riley asked if the homeowner <br /> would be in favor of the project. Mr. Ridgeway confirmed that he agrees. City Engineer/Interim <br /> Public Works Director Westby stated that this is work being completed on private property, <br /> therefore a right of entry will need to be signed by Mr. Ridgeway to allow the work to be <br /> completed. Mr. Ridgeway agreed to sign the necessary document. Councilmember Musgrove <br /> asked if language would need to be added related to the sandbags. Mr. Ridgeway stated that he <br /> would appreciate the sandbag removal as well as those are deteriorating. City Engineer/Interim <br /> Public Works Director Westby confirmed that will be part of the project. <br /> Motion carried. Voting Yes: Chairperson Riley, Councilmembers Woestehoff and Musgrove. <br /> Voting No: None. <br /> 5.02: Update on Plans for Wetland 114P Outlet <br /> Civil Engineer IV Linton reviewed the case. <br /> Councilmember Musgrove referenced the trail that goes over the drainage and asked if that has <br /> any impact on the culvert. <br /> Civil Engineer IV Linton replied that he has no information on when the trail was constructed. <br /> A resident commented that they have been in their home for 45 years and the trail was in place to <br /> access the previous location of playground equipment. She stated that the culvert was changed <br /> when the development in that area was built, noting that it increased in size at that time. <br /> Civil Engineer IV Linton identified where the wetland begins, the path the ditch flows, and the <br /> wetland to the south. He stated that the issue being discussed is that the City has no record of the <br /> pipes that were in place as the outlet is on the end of Junkite Court. He commented that residents <br /> have stated that there was a smaller pipe at a higher elevation that was lowered at some point. He <br /> stated that the DNR reviews the issue and determines where the elevation should be. <br /> Councilmember Woestehoff stated that it appears that residents have opinions that the wetland is <br /> both too high and too low. <br /> Civil Engineer IV Linton stated that the residents that have concern with high water are on the <br /> west side of the wetland, but the actual elevations have not been surveyed in every yard. <br /> Councilmember Woestehoff asked what the problem is that is attempting to be solved. <br /> Civil Engineer IV Linton commented that the wetland is functioning right now, and staff does not <br /> receive complaints about high water in backyards. He stated that the problem, over the last two <br /> years, is that the water level is lower because of a lack of rainfall. He noted that it would be an <br /> aesthetic issue. <br /> Chairperson Riley invited input from the public. <br /> Public Works Committee/ October 18, 2022 <br /> Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.