My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/22/2022
Ramsey
>
Public
>
Agendas
>
Council
>
2022
>
Agenda - Council - 11/22/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:45:25 PM
Creation date
11/29/2022 11:22:04 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/22/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOLTON <br />& MENK <br />Real People. Real Solutions. <br />November 16, 2022 <br />Mr. Bruce Westby, P.E. <br />City Engineer / Interim Public Works Director <br />City of Ramsey <br />7550 Sunwood Drive NW <br />Ramsey, Minnesota 55303 <br />RE: Proposal for Engineering Services — 167th Avenue Reconstruction, CP#23-04 <br />7533 Sunwood Drive NW <br />Suite 206 <br />Ramsey, MN 55303-5119 <br />Ph: (763) 433-2851 <br />Fax: (763) 427-0833 <br />Bolton-Menk.com <br />Dear Mr. Westby: <br />We appreciate the opportunity to present this scope of services for the 167th Avenue Reconstruction <br />Project. Our scope and fees were prepared based on our understanding of the project and our previous <br />experience in delivering State Aid projects. <br />The following proposal is based on your November 1, 2022, email request, including the layouts attached <br />to the email. <br />The proposed improvements will be generally as described below: <br />• 167th Avenue reconstruction from Nowthen Boulevard to St. Francis Boulevard, maintaining in - <br />place roadway widths and sections, <br />• Construction of a 10 ft wide bituminous trail from Nowthen Boulevard to St. Francis Boulevard, <br />• Adjustments of existing public infrastructure, as needed, and <br />• Storm sewer culvert replacements from Nowthen Boulevard to St. Francis Boulevard. <br />Attached is an exhibit received from the City of Ramsey depicting the project area. <br />Project scope assumptions used in creating this fee proposal include the following: <br />• A topographic survey of the corridor was previously completed by Bolton & Menk, Inc. <br />• Geotechnical evaluation and soil borings have been completed. City staff will forward <br />documents for design use. <br />• No Right -of -Way or easements will be required for the project. <br />• State Aid formatted plans and specifications, including plan review checklist, spread <br />calculations, pavement designs, and MnDOT testing forms are required. The signature block will <br />follow the State Aid format. <br />• The City will forward existing plans and record drawings for the corridor for use in creation of <br />the base drawings. <br />• On-line bidding through QuestCDN will be used for procurement of bids, with the on-line bid <br />opening facilitated at Bolton & Menk's Ramsey office location. <br />• Storm sewer, where in place, will be designed to meet State Aid standards for allowable spread. <br />Bolton & Menk is an equal opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.