My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/22/2022
Ramsey
>
Public
>
Agendas
>
Council
>
2022
>
Agenda - Council - 11/22/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:45:25 PM
Creation date
11/29/2022 11:22:04 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/22/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bruce Westby, P.E. <br />November 16, 2022 <br />Page 2 of 3 <br />• No storm water ponding will be required. Water quality will be accounted for in the existing ditch <br />sections. <br />• Construction related services such as staking, administration and observation are not included <br />in this proposal. A separate proposal can be submitted once the extent and timing of the <br />improvements is finalized. <br />PRELIMINARY DESIGN <br />It is our understanding that the city has submitted a letter of intent and received a recommendation from <br />MnDOT to submit a full application for the Minnesota Active Transportation (AT) Infrastructure <br />Program. City staff is preparing the full application and the application deadline is December 30th, 2022, <br />delivery deadline to city staff is December 20th, 2022. Preliminary design services are described below: <br />• A survey base map will be prepared from the data previously collected by Bolton & Menk, Inc. <br />• Preliminary roadway and trail layout designs will be developed into exhibits that can be <br />incorporated into the City's AT grant funding application. Trail alignment alternatives will be <br />developed to determine the most cost-effective solution. <br />• Preliminary Cost Estimate Breakdown — breakdowns will include subtotals for roadway, trail, and <br />storm sewer improvements that can be incorporated into the City's AT grant funding application. <br />• Wetland impacts will be considered. According to the National Wetlands Inventory (NWI) there <br />are various wetlands directly adjacent to the roadway corridor. Wetland related services, <br />including a field delineation and permitting replacement plan are included in this proposal. <br />Wetland delineation field work can begin in spring of 2023. We assume if wetland impacts are <br />necessary, credits may be withdrawn from the City of Ramsey Wetland bank. Attached is a map <br />of NWI wetlands throughout this project corridor. <br />FINAL DESIGN <br />Immediately following preliminary design, Bolton and Menk staff will continue to final design and <br />prepare final construction plans and specifications. Specifications will be comprised of Bolton & Menk, <br />City of Ramsey, and MnDOT components and the anticipated plan set will include the following 53 <br />sheets: <br />o Title (1 sheet), <br />o Estimated Quantities/Standard Plates (1 sheet), <br />o Tabulations (1 sheet), <br />o Alignment Plan and Tabulation (2 sheets), <br />o Typical Sections (1 sheet), <br />o Construction Details (2 sheets), <br />o MnDOT Standard Plan Sheets (6 sheets), <br />o Intersection and Pedestrian Ramp Details (2 sheets), <br />o Storm Water Pollution Prevention Plan (3 sheets), <br />o Erosion and Sediment Control (4 sheets), <br />o Existing Conditions & Removals (4 sheets), <br />o 167`h Avenue Plan and Profile —Street and Storm Sewer (8 sheets), <br />o Signage & Striping (4 sheets), and <br />Bolton & Menk is an equal opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.