My WebLink
|
Help
|
About
|
Sign Out
Home
07/25/00
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Finance Committee
>
Minutes
>
2000's
>
2000
>
07/25/00
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2025 4:04:20 PM
Creation date
5/21/2003 3:01:28 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Document Title
Finance Committee
Document Date
07/25/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
140th Lane NW south along Dysprosium Street NW to County Road #116 then east to the plat <br />limits <br /> <br /> Obtain permits from Anoka County for trail construction <br /> within R.O.W <br />· All grading, sub-cutting/excavation and seeding/restOration by <br /> developer as part of concurrent activity within project. <br />· Reimbursement of approximately 1,117' of trail construction <br /> at $9.50 a lineal foot <br /> TOTAL <br /> <br /> $0.00 <br /> <br /> $0.00 <br /> <br /> $10,611.50 <br />$10,611.50 est. <br /> <br />East edge of Mallard Ponds to the intersection of T.H. 47 and County Road #116 <br /> <br />· Sub-cutting/excavation and final grading by City Staff <br />· Seed, bale checks, and other erosion control <br />· Remove two (2) B 6/12 concrete curb sections and replace with <br /> concrete ped ramps <br />· Relocate three (3) to six (6) trees w}th spade <br />· iRelocate guy wires <br />· Relocate Super America's irrigation (if needed) <br />· Pave approximately 1,042' of trail at $9.50 a lineal foot <br /> TOTAL <br /> <br /> $0.00 <br />$1,500.00 <br />$2,000.00 <br /> <br />$450.00 <br />$0.00 <br />$0.00 <br />$9,899.OO <br />$13,849.00 est. <br /> <br />Trunk Highway #47 to Rnm River Bridge <br /> <br />Ce <br /> <br />· Sub-cutting/excavation and final grading by City Staff <br />· Seed, bale checks, and other erosion control <br />· Remove one (1) B 6/12 concrete curb section .and replace with <br /> concrete ped ramps <br />· Saw cut, remove and dispose of two (2) sections of bituminous <br /> path <br />· Haul and place up to 3000 cubic yards of fill sand and topsoil <br />· Hand rail installation <br />· Guard rail installation <br />· Pave approximately 1,029' oftrai1 at $9.50 a lineal foot <br /> TOTAL <br /> <br /> $0.00 <br />$1,500.00 <br />$1,000.00 <br /> <br />$0.00 <br /> <br /> $0.00 <br />$2,800.00 <br />$3,500.00 <br />$9,775.00 <br />$48,575.50 est. <br /> <br />Contingency costs at 10% <br />Total Cost of Dysprosium Street NW to Rum River Trail <br /> <br />$4,304.00 <br />$47,34O.OO <br /> <br />Finance Committee/July 25, 2000 <br /> Page 2 of 8 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.