Laserfiche WebLink
Per 8-25-03 Project Cost Report <br /> <br />Assumed 3 lane cross-section w/1 tt~'u lane <br />each directfon and left mrn lane/center median <br />and 10' shoulder or 14' right-turn lane along <br />each side 'combination of 4, 5 zmd 6 lane design) <br /> <br />Estimated Cost per 8-25-03 Report = $2,046,000 <br /> <br />MOU ~Li'figauon Element <br /> <br />Count-y wants same 5 lane cross-section as <br />proposed on Ramsey Boulevard with 2 thru <br />lanes each direction and left turn lane/center <br />median and right mrn lanes at'ex, and <br />· proposed intersections. <br /> <br />But cost/fi without ~ crossing pad and gates <br />for Ramsey Boulevard and ibr ,azTnstrong Boulevard <br />are approximately same at $400/LF (inc. OH) <br /> <br />No cost difference to City for Additional Width <br /> <br />Improvements alOha TH #10 - 1/,. mile west of Armstron~ Boulevard to ~/2 east of Sunfish <br /> <br />Lake Boulevard <br /> <br />AUAR Mitigation Element <br /> <br />Add an eastbound and a westbound lane on the <br />intersection approaches at each of three (3) county <br />road intersections along TH #i 0 (at Armstrong, <br />Ramsey and Sunfish Lake Boulevards). <br /> <br />Estimated Cost per 8-25-03 Report <br />(added additional thru lane in each <br />direction for full th_ree mile length) <br /> <br />MOU Mitigation Element <br /> <br />3r° [hl'u lane in each direction along TH #10 <br />will not be constructed for any of three mile length. <br /> <br />Resulting Savings to City <br /> <br />$2,710,800 <br /> <br />$2,710,800 <br /> <br />G:\Municipal\Aramseyk3 i 72\ra3 t 72mitigation measures,doc Page 2 <br /> <br /> <br />