My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Parks and Recreation Commission - 07/13/2000
Ramsey
>
Public
>
Minutes
>
Parks and Recreation Commission
>
2000
>
Minutes - Parks and Recreation Commission - 07/13/2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 10:34:43 AM
Creation date
5/21/2003 3:19:26 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Parks and Recreation Commission
Document Date
07/13/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
· All grading, sub-cutting/excavation and seeding/restoration by <br /> developer as part of concurrent activity within project. <br />· Reimbursement of approximately 1,117' of trail construction <br /> at $9.50 a lineal foot <br /> TOTAL <br /> <br />$0.00 <br /> <br />$10,611.50 <br /> <br />$10,611.50 est. <br /> <br />East edge of Mallard Ponds to the intersection of T. H. 47 and County Road <br />B. · Sub-cutting/excavation and final grading by City Staff <br /> · Seed, bale checks, and other erosion control <br /> · Remove two (2) B 6/12 concrete curb sections and replace with <br /> concrete ped ramps <br /> · Relocate three (3) to six (6) trees with spade <br /> · Relocate guy wires <br /> · Relocate Super America's irrigation (if needed) <br /> · Pave approximately 1,042' of trail at $9.50 a lineal foot <br /> TOTAL <br /> <br />#116 <br /> $0.00 <br /> $1,500.00 <br /> $2,000.00 <br /> <br />$450.00 <br />$0.00 <br />$0.00 <br />$9,899.00 <br />$13,849.00 est. <br /> <br /> Trunk Highway #47 to Rum River Bridge <br />C. · Sub-cutting/excavation and final grading by City Staff <br /> · Seed, bale checks, and other erosion control <br /> · Remove one (1) B 6/12 concrete curb section and replace with <br /> concrete ped ramps <br /> · Saw cut, remove and dispose of two (2) sections of bituminous <br /> path <br /> · Haul and place up to 3000 cubic yards of fill sand and topsoil <br /> · Hand rail installation <br /> · Guard rail installation <br /> · Pave approximately 1,029' of trail at $9.50 a lineal foot <br /> TOTAL <br /> <br />$0.00 <br />$1,500.00 <br />$1,000.00 <br /> <br />$0.00 <br /> <br />$0.00 <br />$2,800.00 <br />$3,500.00 <br />$9,775.OO <br />$48,575.50 est. <br /> <br />Contingency costs at 10% <br />Total Cost of Dysprosium Street NW to Rum River Trail <br /> <br />$4,304.00 <br />$47,340.0O <br /> <br />Funding <br />Trail Development fees <br />(As of July 1, 2000) <br /> <br />$41,850.00 <br /> <br />Mallard Ponds Park Dedication <br /> <br />$5,490.00 <br /> <br />Parks/Utilities Supervisor Boos explained that by combining all of the available trail fees with <br />$5,490.00 in Mallard Ponds park dedication, the City will be able to complete over a half mile of <br />trail in the urban area - the east portion of which has been a high priority for a number of years. <br />It was noted that a separate estimate of $67,000 for the trail construction just east of Trunk <br />Highway #47 (Segment C) was received earlier this year. By performing a significant amount of <br /> <br />Park and Recreation Commission/July 13, 2000 <br /> Page 4 of 6 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.