Laserfiche WebLink
ENGINEER'S ESTIMATE - OPTION 3: SOUTH SHARED USE PATH <br />WATERMAIN <br />QUANTITY AMOUNT <br />STORM SEWER <br />QUANTITY AMOUNT <br />2 $400.00 <br />if y <br />SHARED USE PATH <br />QUANTITY AMOUNT <br />ROADWAY <br />QUANTITY AMOUNT <br />ENGINEER'S ESTIMATE <br />MnDOT TOTAL ESTIMATED TOTAL <br />ITEM NO. SPEC NO. ITEM NOTES QUANTITY UNIT UNIT PRICE AMOUNT <br />39 2573.502 STORM DRAIN INLET PROTECTION 2 EACH $200.00 $400.00 <br />00'00E$ <br />(\\)\\))/\\\\ <br />2,000 <br />500 <br />370 <br />CULVERT END CONTROLS <br />SILT FENCE, TYPE MS <br />SEDIMENT CONTROL LOG TYPE WOOD FIBER <br />FERTILIZER TYPE 3 <br />COMMON TOPSOIL BORROW <br />ROLLED EROSION PREVENTION CATEGORY 20 <br />SEEDING <br />SEED MIXTURE 25-121 <br />HYDRAULIC BONDED FIBER MATRIX <br />4" SOLID LINE MULTI COMP <br />24" SOLID LINE MULTI COMP <br />4" DOUBLE SOLID LINE MULTI COMP <br />PAVEMENT MESSAGE MULTI COMP <br />173 <br />crj <br />TOTAL ESTIMATED CONSTRUCTION COST: <br />(0.63 AC @ $125,000/AC REPLACED @ 2:1 RATIO) <br />TOTAL ESTIMATED WETLAND CREDIT COST: <br />(28,721 SQ FT @ $2.50/SQ FT) <br />TOTAL ESTIMATED PROPERTY ACQUISITION COST <br />(5 POLES @ $10,000/POLE) <br />INCLUDES TOPSOIL STRIPPING AND STOCKPILING <br />STOCKPILE LOCATION: PUBLIC WORKS, 14199 JASPER STREET NW. CONTRACTOR SHALL USE ALL AVAILABLE STOCKPILE MATERIAL BEFORE IMPORTING AGGREGATE <br />