My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/10/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 01/10/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 5:41:05 PM
Creation date
1/13/2023 12:29:58 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/10/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br />Fees Payable to the City <br />1. Park Dedication. The PERMITTEE is responsible for satisfying applicable Park Dedication Fee <br />requirements. PERMITTEE must pay a Park Dedication Fee of $229,500.00 (51 units x <br />$4,500.00 per unit). The PERMITTEE acknowledges that these fees are estimates. The rate in <br />effect when the Plat is recorded will be collected. <br />2. Trail Development Fees. The PERMITTEE is responsible for satisfying applicable Trail <br />Development Fee requirements. PERMITTEE must pay a Trail Development Fee of $76,500.00 <br />(51 units x $1,500.00 per unit). The PERMITTEE acknowledges that these fees are estimates. <br />The rate in effect when the Plat is recorded will be collected. <br />3. Sanitary Sewer Connection (Trunk) Fees. The PERMITTEE is responsible for satisfying <br />applicable Sanitary Sewer Trunk Fee requirements. PERMITTEE must pay a Sanitary Sewer <br />Trunk Fee of $68,799.00 (51 units x $1,349.00). The PERMITTEE acknowledges that these fees <br />are estimates. The rate in effect when the Plat is recorded will be collected. <br />4. Water Connection (Trunk) Fees. The PERMITTEE is responsible for satisfying applicable Water <br />Trunk Fee requirements. PERMITTEE must pay a Water Trunk Fee of $102,459.00 (51 units x <br />$2,009.00 per unit). The PERMITTEE acknowledges that these fees are estimates. The rate in <br />effect when the Plat is recorded will be collected. <br />5. Stormwater Management Fee. The PERMITTEE is responsible for satisfying applicable <br />Stormwater Trunk Fee requirements. PERMITTEE must pay a Stormwater Management Fee <br />of $27,234.00 (51 units x $534.00 per unit). The PERMITTEE acknowledges that these fees are <br />estimates. The rate in effect when the Plat is recorded will be collected. <br />6. Street Light Operation and Maintenance Fee. The PERMITTEE is responsible for a Street Light <br />Operation and Maintenance Fee of $294 per light. PERMITTEE must pay a Street Light <br />Operation and Maintenance Fee of $1,470.00 ($294 x 5 lights = $1,470.00). The PERMITTEE <br />acknowledges that these fees are estimates. The rate in effect when the Plat is recorded will be <br />collected. <br />7. Street Sign Fee. While the CITY provides and installs the street name and traffic control signage, <br />the PERMITTEE is responsible for paying for them at a rate of $245 per sign. PERMITTEE <br />must pay a Street Sign Fee of $5,635.00 ($245 x 6 street name signs; $245 x 13 no parking signs; <br />$245 x 4 stop signs). The PERMITTEE acknowledges that these fees are estimates. The rate in <br />effect when the Plat is recorded will be collected. <br />8. Development Fees for the Outlots. The PERMITTEE acknowledges that development fees are <br />not being collected for any Outlots. The PERMITTEE acknowledges that development fees will <br />be due upon development of any of the Outlots. The rate in effect at the time said future plat(s) is <br />recorded will be collected. <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.