My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/10/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 01/10/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 5:41:05 PM
Creation date
1/13/2023 12:29:58 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/10/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOLTON <br />& MENK <br />Real People. Real Solutions. <br />November 11, 2022 <br />Mr. Bruce Westby, P.E. <br />City Engineer / Interim Director of Public Works <br />City of Ramsey <br />7550 Sunwood Drive NW <br />Ramsey, Minnesota 55303 <br />7533 Sunwood Drive NW <br />Suite 206 <br />Ramsey, MN 55303-5119 <br />RE: Proposal for Engineering Services — Trott Brook Lift Station Improvement Project <br />Ph: (763) 433-2851 <br />Fax: (763) 427-0833 <br />Bolton-Menk.com <br />Dear Mr. Westby: <br />Bolton & Menk, Inc. appreciates the opportunity to submit this proposal for professional engineering <br />services related to the above referenced project. The project includes construction of a lift station, valve <br />vault and forcemain. <br />UNDERSTANDING <br />A summary of the primary project components is presented below: <br />Lift Station Site — The site is located in the southwest portion of the Makowsky Addition <br />development area. <br />Lift Station - A wet well structure will be installed to capture sanitary sewer flow from the <br />Makowsky Addition development, along with areas to the north and east of the lift station site. <br />The future sanitary sewer line to the east is estimated at 29 feet deep. The bottom of the lift <br />station will be approximately 4 to 6 feet lower, or 33 to 35 feet deep. <br />Valve Vault — The structure will be placed near the lift station. <br />Forcemain — The forcemain will be installed from the lift station to an existing manhole located <br />in Variolite Street. The estimated length of forcemain is 2,300 feet. Final sizing of the forcemain <br />will be completed as a portion of the project design. <br />Site Improvements — Improvements at the site will include an access drive and maintenance pad. <br />We will work with the developer as we prepare the site grading plan. <br />ASSUMPTIONS <br />Our proposal is based on the best information available and accounts for minor scope revisions as the <br />project moves forward. For clarity, we have listed a majority of the assumptions below as they relate to <br />the project as a whole: <br />Plans and Specifications will be prepared to allow for a public bidding process. Project <br />specifications will be prepared using Bolton & Menk specifications. <br />The Project Schedule will allow for 2023 bidding and construction. <br />The Preliminary Construction Cost for the improvements is estimated at $1,375,000. <br />Bolton & Menk is an equal opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.