Laserfiche WebLink
BOLTON <br />& MENK <br />Real People. Real Solutions. <br />November 11, 2022 <br />Mr. Bruce Westby, P.E. <br />City Engineer / Interim Director of Public Works <br />City of Ramsey <br />7550 Sunwood Drive NW <br />Ramsey, Minnesota 55303 <br />7533 Sunwood Drive NW <br />Suite 206 <br />Ramsey, MN 55303-5119 <br />RE: Proposal for Engineering Services — Trott Brook Lift Station Improvement Project <br />Ph: (763) 433-2851 <br />Fax: (763) 427-0833 <br />Bolton-Menk.com <br />Dear Mr. Westby: <br />Bolton & Menk, Inc. appreciates the opportunity to submit this proposal for professional engineering <br />services related to the above referenced project. The project includes construction of a lift station, valve <br />vault and forcemain. <br />UNDERSTANDING <br />A summary of the primary project components is presented below: <br />Lift Station Site — The site is located in the southwest portion of the Makowsky Addition <br />development area. <br />Lift Station - A wet well structure will be installed to capture sanitary sewer flow from the <br />Makowsky Addition development, along with areas to the north and east of the lift station site. <br />The future sanitary sewer line to the east is estimated at 29 feet deep. The bottom of the lift <br />station will be approximately 4 to 6 feet lower, or 33 to 35 feet deep. <br />Valve Vault — The structure will be placed near the lift station. <br />Forcemain — The forcemain will be installed from the lift station to an existing manhole located <br />in Variolite Street. The estimated length of forcemain is 2,300 feet. Final sizing of the forcemain <br />will be completed as a portion of the project design. <br />Site Improvements — Improvements at the site will include an access drive and maintenance pad. <br />We will work with the developer as we prepare the site grading plan. <br />ASSUMPTIONS <br />Our proposal is based on the best information available and accounts for minor scope revisions as the <br />project moves forward. For clarity, we have listed a majority of the assumptions below as they relate to <br />the project as a whole: <br />Plans and Specifications will be prepared to allow for a public bidding process. Project <br />specifications will be prepared using Bolton & Menk specifications. <br />The Project Schedule will allow for 2023 bidding and construction. <br />The Preliminary Construction Cost for the improvements is estimated at $1,375,000. <br />Bolton & Menk is an equal opportunity employer. <br />