My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Public Works Committee - 01/20/2004
Ramsey
>
Public
>
Minutes
>
Public Works Committee
>
2000 - 2009
>
2004
>
Minutes - Public Works Committee - 01/20/2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:24:26 PM
Creation date
1/20/2023 9:08:18 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Public Works Committee
Document Date
01/20/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-TON & M F'N K, INC. <br />Brian Olson, City. of Ramsey <br />January 14, 2004 <br />Page 2 of 2 <br /> <br />pump supplier to ensure all as-built drawings and equipment operation manuals are provided; and 6) <br />coordinate the incorporation of the new well into the existing SCADA system. <br /> <br />Task 4 -Interconnecting Watermains <br />In this task, we would perform the following major items: 1) provide engineering documents to secure a <br />qualified contractor to install the interconnecting watermains and associated road work and obtain <br />approval from MDH, DNR and other agencies; 2) coordinate and assist the City staff in processing and <br />obtaining all necessary permits; 3) perform bidding services; 4) provide the necessary construction <br />engineering and periodic construction observation services during the construction of the interconnecting <br />watermains along with the associated road work to ensure the facility is constructed according to the plans <br />and specifications; 5) coordinate and assist the City in reviewing the watermain/road work contractor <br />payment requests; and 6) coordinate with the watermain/road work contractor to ensure all as-built <br />drawings are provided. <br /> <br />The costs to perform the tasks described above would be the not-to-exceed amounts presented below: <br /> Task 1 $52,930 <br /> Task 2 13,000 <br /> Task 3 8,000 <br /> Task 4 12,000 <br /> Total Estimated Costs $85,930 <br /> <br />Only the actual costs incurred to perform the work would be billed. A more detailed cost breakdown is <br />attached for your review. <br /> <br />We would proceed with the work as soon as we receive approval from the City, and complete the work <br />within the City's time schedule. <br /> <br />If you have any questions or need further information, please call me at 507-625-4171. Thank you! <br /> <br />Sincerely, <br /> <br />B OLTON_&-MENK, 1NC. <br /> <br />Ro'-bert ~v[. 'Brown, P.:E. <br />Vice President <br /> <br />RM~:bja <br /> <br />cc: Jon Peterson, Bolton & Menk, Inc. <br /> <br />G:~.ramsey\OlsonLT2~W¢ll No 6.doc <br /> <br />-42- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.