Laserfiche WebLink
COST BREAKDOWN <br />FOR TIlE ENGINEERING AND ASSOCIATED COSTS FOR <br />WELL NO. 6 <br /> CITY OF RAMSEY, MINNESOTA <br /> <br />Task 1 - Developing Monitoring Wells <br />A. Construction of Monitoring Wells <br /> Cost Estimate <br />Item No. Description Est. # Units Unit Price Total Price <br />1 Mobil./Demobil. 1 LS $4,500.00 <br />2 Drill 8.5" dia. Borehole 600 ft. $12.00/ft. 7,200.00 <br />3 Set 4" dia. Casing 605 ft. $8.00/ft. 4,840.00 <br />4 Set 4" P.S.S.S. Screen 12 ft. $20.00/ft. 240.00 <br />5 F & I Neat Cement Grout 150 bags. $15.00/yd. 2,250.00 <br />6 Drill 4" Open Hole 510 ft. $10.00/ft. 5,100.00 <br />7 F.I.R. Test Pump Equip. 6 $300.00/ft. 1,800.00 <br />8 Test Pumping 12 hr. $100.00/hr. 1,200.00 <br />9 Water Analysis 3 ea. $1,100/each 3,300.00 <br />10 Gamma Log & Report 3 ea. $1,100.00/hr. 3,300.00 <br /> l 1 Clean Up & Cap 6 $200.00/hr. 1,200.00 <br /> 12 Electronic Loggers 3 $2,500/ea. 7,500.00 <br /> 13 Vibration Testing 1 LS 1,500.00 <br /> Total Costs for Construction of M0nitoring Wells $43,930.00 <br />B. E.ngineering <br /> 1. Prepare specifications and 80 hrs. $6,000.00 <br /> coordination with DNR, tV[DH <br /> and other agencies <br /> 2. On-site coordination and 40 hrs. 3,000.00 <br /> observation during monitoring <br /> well construction <br /> Total Engineering Costs $9,000.00 <br /> Total Costs for Task 1 $52,930.00 <br />Task 2 - Water Supply Well <br /> 1. Coordination with DNR, IV[DH 40 hrs. $3,000.00 <br /> and other agencies <br /> 2. Prepare P & S for well 40 hrs. 3,000.00 <br /> 3. Bidding services 10 hrs. 1,000.00 <br /> 4. Construction engineering services 80 hrs. 6,000.00 <br /> Total Cost Task 2 $13,000.00 <br />Task 3 - Well Supply Pump <br /> 1. Coordination with DNR, MDH 8 hrs. $500.00 <br /> and other agencies <br /> 2. Prepare P & S for well pump and 50 hrs. 5,000.00 <br /> associated controls <br /> 3. Bidding services 10 hrs. 1,000.00 <br /> 4. Construction engineering services 20 hrs. 1,500.00 <br /> Total Cost Task 3 $8,000.00 <br />Task 4 - Interconnecting Watermain <br /> 1. Coordination with DNR, MDH 8 hrs. $500.00 <br /> and other agencies <br /> 2. Prepare P & S for watermain 60 hrs. 4,500.00 <br /> 3. Bidding services 10 hrs. 1,000.00 <br /> 4. Construction engineering services 80 hrs. 6,000.00 <br /> Total Cost Task 4 $12,000.00 <br /> <br />G:\ramsey\Cost f~reakdown-Well No 6.tloc -43- <br /> <br /> <br />