My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/24/2006
Ramsey
>
Public
>
Agendas
>
Council
>
2006
>
Agenda - Council - 01/24/2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 2:56:26 PM
Creation date
1/20/2006 12:16:26 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/24/2006
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hakanson <br />Anderson <br />Assoc., Inc. <br /> <br />3601 Thurston Avenue, Anoka, MN 55303 <br />Phone: 763/427-5860 F&x: 763/427-0520 <br /> <br />January 18, 2006 <br /> <br />Mr. Brian Olson <br />Assistant Public Works Director/Principal City Engineer <br />City of Ramsey <br />15153 Nowthen Blvd. NW <br />Ramsey, MN 55303-6197 <br /> <br />RE: Engineering Proposal for the Design of City Phase 2, Segments II and III Street, Storm Sewer, <br /> Watermain and Sanitary Sewer Improvements in the Ramsey Town Center <br /> <br />Dear Bran: <br /> <br />Thank you for the opportunity to submit our proposal for engineering services for the City Phase 2, Segments II <br />and III Improvements in Ramsey Town Center. As requested, we separated our design and construction costs <br />into separate segments along Civic Center Drive, Rhinestone Street and Zeolite Street as shown in our <br />feasibility study dated January 20, 2005. Our design costs and engineering costs during construction for each of <br />the segments are as follows: <br /> <br />PROJECT SEGMENT <br /> <br />DESIGN COST <br /> <br />ENGINEERING COSTS <br />DURING CONSTRUCTION <br /> <br />II: A. <br /> <br />Zeolite Street from Sunwood Drive to <br />Bunker Lake Boulevard <br /> <br />$39,500.00 $19,975.00 <br /> <br />II: B. Zeolite Street Bridge <br /> <br />$87,872.00 $98,802.00 <br /> <br />III: A. <br /> <br />Civic Center Drive from Sapphire Street <br />to Rhinestone Street <br /> <br />$19,900.00 $9,875.00 <br /> <br />III: B. <br /> <br />Rhinestone Street from Civic Center Drive <br />to Sunwood Drive $ 4,900.00 <br /> <br />$5,650.00 <br /> <br />Total Costs: <br /> <br />$152,172.0,0 <br /> <br />$134,302.00 <br /> <br />The above cost includes preparation of final plm~s and specifications for bidding purposes and State Aid <br />approval for Segments II-A, II-B and III-B. The engineering ~costs during construction include contract <br />administration, surveying, inspection and material testing for the bridge and completion of as-built plans. The <br />above costs do not included inspection or materials testing for the streets and utilities on Zeolite Street, Civic <br />Center Drive and Rhinestone Street. <br /> <br /> G:\O FFICE\PROPOSAL~2006\B rianOIson.do¢ <br />-290-- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.