My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/14/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 02/14/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:59:01 AM
Creation date
2/14/2023 9:47:12 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/14/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
392
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRAFFIC & PARKING IMPACT LETTER - DRAFT <br />ANOKA RAMSEY ATHLETI C ASSOCIATION DOME <br />INTERSECTION 3 <br />• Intersection 3 is the intersection of Ferret Street Northwest and the proposed facility's entrance <br />driveway. It is currently designed as a one -lane approach accommodating inbound movements only. <br />Intersection 3 is located 27.5 feet from Intersection 2, measured center -to -center. The close proximity <br />of Intersections 2 and 3 will create a skewed alignment with additional conflict points and minimum <br />queuing length. Navigation through Intersection 2 and 3 may be difficult for drivers. It is recommended <br />that with future improvements of Ferret Street Northwest, that Intersections 2 and 3 are aligned. <br />• Overall the approach will operate at a LOS A during peak time and delay will likely be due to driver error <br />from the intersection proximity. <br />INTERSECTION 4 <br />• Intersection 4 is created as the exit for the proposed facility and is currently designed as a one -lane <br />outbound movement only which turns onto a single lane for northbound and southbound traffic. It is <br />recommended that the eastbound lane is signed with a stop sign at the intersection. <br />• Overall the approach will operate at a LOS A during peak time and delay will likely be due to driver error. <br />It is unlikely that the proposed facility and the surrounding roadway network will experience their PM peak hour <br />concurrently. The provided analysis shows that the current infrastructure can support this occurrence with the <br />increase in background traffic and optimization of the split times at Intersection 1. Additional improvements to <br />Intersections 1, 2, 3, and 4 are related to geometric and signing needs to reduce conflict points and increase <br />safety. With the potential improvements to Ferret Street Northwest it is recommended to address alignment and <br />circulation concerns for this portion of The COR. <br />The addition of the proposed traffic as a result of the Anoka Ramsey Athletic Association Dome development, <br />potential clinic, and potential restaurant will have minimal effect on level of service and delay currently <br />experienced and projected to be experienced within the PM peak hour. <br />Architecture + Engineering + Environmental + Planning Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.