My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/14/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 02/14/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:59:01 AM
Creation date
2/14/2023 9:47:12 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/14/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
392
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRAFFIC & PARKING IMPACT LETTER - DRAFT <br />ANOKA RAMSEY ATHLETI C ASSOCIATION DOME <br />PARKING ANALYSIS <br />Reviewing the proposed use of sports dome, an analysis was completed based on the courts and fields within <br />the facility. The dome is proposed to hold one and half (1.5) multi -purpose fields and eight (8) courts that can be <br />used for high school or youth sports. It is common that youth practices are earlier in the evening and high school <br />level sports later in the evening. The site plan in Appendix A has 135 parking stalls. <br />YOUTH SPORTS <br />For youth sports it is assumed that guardians will drop-off and pick-up their players within a varying time before <br />and after scheduled practice times. Primary parking needs for youth sports would be for the coaches. To support <br />this assumption, seating for viewing is limited within the facility. The multi -purpose field can support three (3) <br />youth size fields and eight (8) courts, the maximum and average use of the facility was analyzed. Tables 7 and <br />8 list the maximum and average use of the space for youth sports. <br />Total No. of Youth <br />No. of Players <br />per <br />No. of <br />Coaches <br />Total No. of Users <br />Percentage of <br />No. of Vehicles <br />Courts <br />Court <br />per <br />Court <br />per Courts <br />Users Parking <br />Parking <br />Total No. of Youth <br />No. of Players <br />per <br />No. of <br />Coaches <br />Total No. of Users <br />Percentage of <br />No. of Vehicles <br />Fields <br />Field <br />per <br />Field <br />per Fields <br />Users Parking <br />Parking <br />Maximum <br />No. of Parking <br />Stalls <br />Utilized <br />During Practice for Youth <br />Level Sports Only <br />Table 7. Maximum parking needs of ARAA for youth sports. <br />Table 8: Average parking needs of ARAA for youth sports. <br />The parking needs for youth sports at maximum capacity is around 19% of the total parking provided. It is likely <br />that within the practice time for youth rated sports the pick-up / drop-off will be utilized more than the general <br />parking lot. Queuing may be experienced within the parking lot at the beginning and end of practice times but <br />will likely be cleared with minimum impact to the surrounding roadway network. Note this is assuming that bus <br />shuttles are not being provided for teams. <br />Architecture + Engineering + Environmental + Planning <br />Page 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.