My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 02/02/2006
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2006
>
Agenda - Planning Commission - 02/02/2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 9:39:00 AM
Creation date
1/27/2006 1:17:10 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
02/02/2006
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
public safet~ and public works standpoint. Once the future development phase happens, the <br />private cul-de-sac could be put in place with the public street connecting to Alpine Drive. <br /> <br />Another public safety concern is the limitation of only one access point for 59 townhome units <br />onto I51st Lane. If a secondary access cannot be provided, the number of units may need to be <br />restricted until such time as a second access point is available. <br /> <br />The City will hire a traffic consultant to review the traffic patterns and traffic impact of the <br />development. The costs of this study will be billed to the Developer. <br /> <br />A detailed drainage and grading plan will be addressed during the preliminary plat and site plan <br />process. <br /> <br />A tree preservation plan and density transition provisions will need to be shown as part of the <br />preliminary plat submittal. <br /> <br />Recommendation: <br /> <br />The sketch plan process provides the Planning Commission the oppommity to relay to the <br />developer components of the proposed subdivision related to street network, townhome layout, <br />and overall residential design that are acceptable and components that may need further analysis <br />.during preliminary plat submittal. <br /> <br />Commission Action: <br /> <br />Provide the developer with feedback and direction related to the proposed sketch plan. <br /> <br />Review Checklist: <br /> <br />Asst. Community Development Director <br />Zoning and Recycling Coordinator <br />Civil Engineer <br /> <br />PC: 02/02/06 <br /> <br />44 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.