My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 02/21/2023
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2023
>
Agenda - Public Works Committee - 02/21/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:42:22 AM
Creation date
2/16/2023 4:32:33 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
02/21/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
511
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CSAH 5 and CASH 56 (Ramsey Boulevard) <br />An elevated crash history was observed at the CSAH 56 (Ramsey Boulevard) intersection, including injury <br />crashes. The traffic volume from northbound CSAH 56 to northbound CSAH 5 is expected to increase with the <br />completion of the interchanges on US Highway 10. Turn lane and roundabout concepts were considered for this <br />location; both concepts have a similar construction cost, approximately $3,000,000, and impacts. The roundabout <br />concept provides more effective safety and traffic benefits compared to the turn lane concept. Additionally, the <br />roundabout concept will allow the CSAH 56 intersection to function as a node between similar volume roadways <br />and offers some reserve capacity for future traffic growth. <br />Recommendation: Implement a roundabout before completion of the US Highway 10 grade separation to <br />accommodate the anticipated traffic shift. <br />CSAH 5 and Sunwood Drive <br />An elevated crash history was observed at the Sunwood Drive intersection, including injury crashes. It was <br />determined that a roundabout concept can help slow traffic through this area and improve access to/from the side <br />street. Additionally, the roundabout concept can project safer pedestrian and bike crossings with the trail <br />connections at this location. <br />Recommendation: Implement a roundabout as soon as funding and planning allows, including opportunities for <br />improved trail crossings. <br />Funding Source: <br />City State Aid Funds are proposed to fund the majority of the City's share of each of the proposed <br />improvements, as needed. Stormwater Funds could also be used to fund required storm sewer improvements. <br />Other funding sources may be explored and used for off -roadway improvements at the time each project is <br />implemented. <br />Recommendation: <br />N/A <br />Action: <br />No action is required or requested at this time. <br />Final CSAH 5 Corridor Study <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Brian Hagen Brian Hagen 02/16/2023 01:50 PM <br />Form Started By: Bruce Westby Started On: 02/09/2023 01:55 PM <br />Final Approval Date: 02/16/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.