Laserfiche WebLink
CSAH 5 and CASH 56 (Ramsey Boulevard) <br />An elevated crash history was observed at the CSAH 56 (Ramsey Boulevard) intersection, including injury <br />crashes. The traffic volume from northbound CSAH 56 to northbound CSAH 5 is expected to increase with the <br />completion of the interchanges on US Highway 10. Turn lane and roundabout concepts were considered for this <br />location; both concepts have a similar construction cost, approximately $3,000,000, and impacts. The roundabout <br />concept provides more effective safety and traffic benefits compared to the turn lane concept. Additionally, the <br />roundabout concept will allow the CSAH 56 intersection to function as a node between similar volume roadways <br />and offers some reserve capacity for future traffic growth. <br />Recommendation: Implement a roundabout before completion of the US Highway 10 grade separation to <br />accommodate the anticipated traffic shift. <br />CSAH 5 and Sunwood Drive <br />An elevated crash history was observed at the Sunwood Drive intersection, including injury crashes. It was <br />determined that a roundabout concept can help slow traffic through this area and improve access to/from the side <br />street. Additionally, the roundabout concept can project safer pedestrian and bike crossings with the trail <br />connections at this location. <br />Recommendation: Implement a roundabout as soon as funding and planning allows, including opportunities for <br />improved trail crossings. <br />Funding Source: <br />City State Aid Funds are proposed to fund the majority of the City's share of each of the proposed <br />improvements, as needed. Stormwater Funds could also be used to fund required storm sewer improvements. <br />Other funding sources may be explored and used for off -roadway improvements at the time each project is <br />implemented. <br />Recommendation: <br />N/A <br />Action: <br />No action is required or requested at this time. <br />Final CSAH 5 Corridor Study <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Brian Hagen Brian Hagen 02/16/2023 01:50 PM <br />Form Started By: Bruce Westby Started On: 02/09/2023 01:55 PM <br />Final Approval Date: 02/16/2023 <br />