Laserfiche WebLink
• Ramsey Parkway - Segments A-1 and A-2 <br />o Extension of Ramsey Parkway from Willemite Street NW to Sunwood Drive Roundabout. <br />• Two 24-foot one way roadways <br />o 6-foot concrete sidewalks on the north and south sides <br />• Construct bioretention basin in median, lined to prevent infiltration <br />o Extension of sanitary sewer, storm sewer and watermain. <br />• Reroute existing 18-inch sanitary sewer to new alignment if required with A-1. <br />• Center Street - Segment B-1 and B-2: <br />o Extension of Center Street NW to Bunker Lake Boulevard. <br />• Extend the existing typical section from the south to 146t' Avenue <br />• Widen Center Street to a Parkway from 146t' Avenue to Bunker Lake Boulevard <br />• Subject to Anoka County approval. <br />o Extension of storm sewer as needed for roadway drainage. <br />• Willemite Street — Segment C <br />o Constructed with Affinity at Ramsey Housing <br />• Sunwood Drive Boulevard - Segments D-1, D-2, D-3 and D-4: <br />o Construction of sidewalk and plantings along the north side of Sunwood Drive. <br />• Extend the existing boulevard layout used east of Sapphire Street NW <br />• Yolite Street - Segment E: <br />o Construction of Yolite Street NW from Sunwood Drive to Ramsey Parkway. <br />• 36-foot roadway with 6-foot sidewalks on both sides <br />o Extension of watermain. <br />o Extension of storm sewer for regional pond outlet. <br />• Zeolite Street - Segment F-1 and F-2: <br />o Construction of Zeolite Street NW from Sunwood Drive to Bunker Lake Boulevard. <br />• 40-foot roadway with 6-foot sidewalks on both sides. <br />o Adjust watermain to proposed grades <br />o Extension of storm sewer for roadway drainage <br />o Extension of sanitary sewer for service to adjacent parcels <br />• Bunker Lake Boulevard - Segment G: <br />o Construction of Bunker Lake Boulevard from Armstrong Boulevard to Ramsey Boulevard. <br />• 4-lane divided roadway with concrete median as depicted in the Anoka County 2030 <br />Transportation Plan, costs not included in this analysis. <br />o Anoka County State Aid Highway 116 <br />• Veterans Drive - Segment H: <br />o Construction of Veterans Drive from Rhinestone Street to Ramsey Boulevard. <br />• 36-foot roadway with 6-foot sidewalks on both sides. <br />• Subject to Anoka County approval. <br />o Extension of watermain. <br />o Extension of storm sewer for roadway drainage. <br />• Peridot Street - Segment I: <br />o Construction of Peridot Street NW from Sunwood Drive to Veterans Drive. <br />• 36-foot roadway with 6-foot sidewalks on both sides. <br />Prepared by: Bolton & Menk, Inc. DESIGN SUMMARY <br />The CUR Analysis 1 0R1.129128 Page 13 <br />