Laserfiche WebLink
o Extension of sanitary sewer south from Sunwood Drive. <br />o Extension of watermain. <br />o Extension of storm sewer for roadway drainage. <br />Estimated project costs for each segment were developed to allow for the City to plan for the sequenced <br />implementation of the improvements and are summarized later in this report. <br />IX. ;°: , T ANALYSIS <br />Costs estimates were developed for each improvement type. These estimates are based on recent bid <br />pricing and similar projects. The segments are depicted on Figure 2 in Appendix B. All costs are <br />presented as 2023 costs. <br />Ramsey Parkway <br />Improvement gment A-1 <br />Roadway <br />Trails/Sidewalks <br />Street Lighting <br />Storm Sewer <br />Trunk Storm Sewer <br />Watermain <br />Sanitary Sewer <br />Trunk Sanitary Sewer <br />Total Costs <br />Improvement <br />Roadway <br />Trails/Sidewalks <br />Street Lighting <br />Storm Sewer <br />Watermain <br />Sanitary Sewer <br />Total Costs <br />Improvement <br />Roadway <br />Trails/Sidewalks <br />Street Lighting <br />Storm Sewer <br />Trunk Storm Sewer <br />Watermain <br />Sanitary Sewer <br />Total Costs <br />Prepared by: Bolton & Menk, Inc. <br />The COR Analysis I OR1.129128 <br />$ 988,000 <br />$ 196,000 <br />$ 289,000 <br />$ 530,000 <br />$ 26,000 <br />$ 246,000 <br />$ 104,000 <br />$ 294.000 <br />$ 2,673,000 <br />Center Street <br />ment B-1 <br />114,000 <br />44,000 <br />74,000 <br />40,000 <br />0 <br />0 <br />272,000 <br />gment A-2 <br />$ 500,000 <br />$ 99,000 <br />$ 146,000 <br />$ 268,000 <br />$ 0 <br />$ 173,000 <br />$ 97,000 <br />$ 0 <br />$ 1,283,000 <br />She ment B-2 <br />$ 543,000 <br />$ 153,000 <br />$ 204,000 <br />$ 132,000 <br />$ 0 <br />$ 0 <br />$ 1,032,000 <br />Yolite Street Zeolite Street <br />Segment E She ment F-1 <br />$ 419,000 <br />$ 118,000 <br />$ 157,000 <br />$ 102,000 <br />$ 112,000 <br />$ 169,000 <br />$ 92.000 <br />$ 1,169,000 <br />$ 412,000 <br />$ 116,000 <br />$ 155,000 <br />$ 66,000 <br />$ 0 <br />$ 136,000 <br />$ 88.000 <br />$ 973,000 <br />She ment F-2 <br />$ 426,000 <br />$ 120,000 <br />$ 159,000 <br />$ 68,000 <br />$ 81,000 <br />$ 140,000 <br />$ 91.000 <br />$ 1,085,000 <br />COST ANALYSIS <br />Page 14 <br />