o Extension of sanitary sewer south from Sunwood Drive.
<br />o Extension of watermain.
<br />o Extension of storm sewer for roadway drainage.
<br />Estimated project costs for each segment were developed to allow for the City to plan for the sequenced
<br />implementation of the improvements and are summarized later in this report.
<br />IX. ;°: , T ANALYSIS
<br />Costs estimates were developed for each improvement type. These estimates are based on recent bid
<br />pricing and similar projects. The segments are depicted on Figure 2 in Appendix B. All costs are
<br />presented as 2023 costs.
<br />Ramsey Parkway
<br />Improvement gment A-1
<br />Roadway
<br />Trails/Sidewalks
<br />Street Lighting
<br />Storm Sewer
<br />Trunk Storm Sewer
<br />Watermain
<br />Sanitary Sewer
<br />Trunk Sanitary Sewer
<br />Total Costs
<br />Improvement
<br />Roadway
<br />Trails/Sidewalks
<br />Street Lighting
<br />Storm Sewer
<br />Watermain
<br />Sanitary Sewer
<br />Total Costs
<br />Improvement
<br />Roadway
<br />Trails/Sidewalks
<br />Street Lighting
<br />Storm Sewer
<br />Trunk Storm Sewer
<br />Watermain
<br />Sanitary Sewer
<br />Total Costs
<br />Prepared by: Bolton & Menk, Inc.
<br />The COR Analysis I OR1.129128
<br />$ 988,000
<br />$ 196,000
<br />$ 289,000
<br />$ 530,000
<br />$ 26,000
<br />$ 246,000
<br />$ 104,000
<br />$ 294.000
<br />$ 2,673,000
<br />Center Street
<br />ment B-1
<br />114,000
<br />44,000
<br />74,000
<br />40,000
<br />0
<br />0
<br />272,000
<br />gment A-2
<br />$ 500,000
<br />$ 99,000
<br />$ 146,000
<br />$ 268,000
<br />$ 0
<br />$ 173,000
<br />$ 97,000
<br />$ 0
<br />$ 1,283,000
<br />She ment B-2
<br />$ 543,000
<br />$ 153,000
<br />$ 204,000
<br />$ 132,000
<br />$ 0
<br />$ 0
<br />$ 1,032,000
<br />Yolite Street Zeolite Street
<br />Segment E She ment F-1
<br />$ 419,000
<br />$ 118,000
<br />$ 157,000
<br />$ 102,000
<br />$ 112,000
<br />$ 169,000
<br />$ 92.000
<br />$ 1,169,000
<br />$ 412,000
<br />$ 116,000
<br />$ 155,000
<br />$ 66,000
<br />$ 0
<br />$ 136,000
<br />$ 88.000
<br />$ 973,000
<br />She ment F-2
<br />$ 426,000
<br />$ 120,000
<br />$ 159,000
<br />$ 68,000
<br />$ 81,000
<br />$ 140,000
<br />$ 91.000
<br />$ 1,085,000
<br />COST ANALYSIS
<br />Page 14