My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 02/21/2023
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2023
>
Agenda - Public Works Committee - 02/21/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:42:22 AM
Creation date
2/16/2023 4:32:33 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
02/21/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
511
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The total for Municipal Plaza Improvements is estimated at $4,091,000. Costs and improvements are <br />based on 2018 Cite Cost Estimating effort, adjusted for 2023 pricing. Additionally, an analysis was <br />completed focused on stormwater, stormwater reuse, and irrigation alternatives. Current stormwater reuse <br />project costs are estimated at $2,285,000. The analysis memorandum dated June 25. 2019, is in Appendix <br />F for reference. <br />General Cost Estimating Assumptions <br />• Dewatering will be required for sewer and water installation. <br />• Fill will be required for all roadways, with exception of Zeolite Street. <br />• Aggregate base cost does not assume use of City stockpile. <br />• Costs associated with creating the bioretention basin are included in the storm utility portions of <br />Ramsey Parkway (Segments A-1 and A-2). <br />Segment A Assumptions <br />• Removal of existing 42-inch storm sewer included in trunk storm sewer cost. A portion was <br />removed with the Affinity at Ramsey housing project. <br />• Sanitary sewer is assumed to extend to midpoint of last parcels serviced by sewer line. <br />• Includes an allotment for (2) 6 ft wide sidewalks along the roadway boulevard areas. <br />• Costs for the median include restoration and plantings. <br />• 8-inch sanitary sewer is assumed to extend to midpoint of last parcels serviced by sewer line. <br />Segment B-2 Assumptions <br />• Realignment of Center Street as shown in the COR Framework Plan included in the project cost. <br />o The cost for B-2 could be eliminated from the project if the existing roadway were to <br />remain in place. <br />Segment E Assumptions <br />• 30-inch regional pond outlet pipe included in trunk storm sewer cost. <br />• Extension of sanitary sewer laterals to the right of way included in sanitary sewer cost. <br />Segments H & I Assumptions <br />• 8-inch sanitary sewer is assumed to extend to midpoint of last parcels serviced by sewer line. <br />Grading Assumptions <br />• Wetland Mitigation will be completed via purchasing wetland credits. Credit costs are continually <br />modified and subject to change. Wetland credits must be purchased at a ratio of twice the acreage <br />of impact. <br />• Swell factor of excavated material is estimated at 10%. <br />• Shrinkage factor of installed/compacted material is estimated at 25%. <br />• Borrow material cost assumes use of regional pond excavation. Additional import material will be <br />required if excavation material is depleted. Preliminary calculations indicate borrow material will <br />not be required, however it will be dependent on individual site plans. <br />• Trees will be replaced in accordance with City ordinances. <br />Additional Assumptions <br />• No costs associated with construction of individual storm water ponds are included, as it is <br />anticipated the regional pond will address all storm water runoff requirements. The regional pond <br />Prepared by: Bolton & Menk, Inc. <br />The COR Analysis I OR1.129128 <br />COST ANALYSIS <br />Page 16 <br />