My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 02/28/2023
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2023
>
Agenda - Council Work Session - 02/28/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:00:37 AM
Creation date
2/24/2023 8:29:45 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
02/28/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
454
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OnIn BOLTON <br />& MENK <br />Real People. Real Solutions. <br />November 23, 2021 <br />Mr. Bruce Westby, P.E. <br />City Engineer <br />City of Ramsey <br />7550 Sunwood Drive NW <br />Ramsey, Minnesota 55303 <br />7533 Su nwood Drive NW <br />Suite 206 <br />Ramsey, MN 55303-5119 <br />Ph: (763) 433-2851 <br />Fax: (763) 427-0833 <br />Bolton-Menk.com <br />RE: Proposal for Engineering Services — West Armstrong Redevelopment Area Topographic Survey <br />Dear Mr. Westby: <br />We appreciate the opportunity to present this scope of services for a topographic survey of the West <br />Armstrong Redevelopment Area Improvement project. Our scope and fees were prepared based on our <br />conversations, along with previous documents prepared for the area. The proposed improvements will be <br />generally as described below: <br />• Street construction & reconstruction of Ferret Street from 146' Avenue to Bunker Lake <br />Boulevard, <br />• Street reconstruction of 1471h Avenue and 146th Avenue to the extents shown on the attached <br />figure, <br />• Extension of sanitary sewer, water and storm sewer to serve the area, and <br />• Improvements to Bunker Lake Boulevard necessary to allow for the Ferret Street connection. <br />Project scope assumptions used in creating this fee proposal include the following: <br />• A topographic survey of the corridors will be required for the project. The Bunker Lake <br />Boulevard survey and design will be completed separately. <br />SCHEDULE AND FEES <br />Bolton & Menk will immediately schedule the survey and attempt to complete in 2021. Based on our <br />understanding of the improvements, our proposed fees for the work are $7,955.00. <br />If there are any questions related to this proposal, please call me at (651) 968-7760. <br />Sincerely, <br />Bolton & Menk, Inc. <br />Kevin P. Kielb, P.E. <br />Principal Engineer <br />Bolton & Menk is an equal. opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.