Laserfiche WebLink
OBOLTON <br />Real People. Real Solutions. <br />November 23, 2021 <br />Mr. Bruce Westby, P.E. <br />City Engineer <br />City of Ramsey <br />7550 Sunwood Drive NW <br />Ramsey, Minnesota 55303 <br />RE: Proposal for Engineering Services — West Armstrong Redevelopment Area <br />Dear Mr. Westby: <br />7533 Sunwood Drive NW <br />Suite 206 <br />Ramsey, MN 55303-5119 <br />Ph: (763) 433-2851 <br />Fax: (763) 427-0833 <br />Bolton-Menk.com <br />We appreciate the opportunity to present this scope of services for the West Armstrong Redevelopment <br />Area Improvement project. Our scope and fees were prepared based on our conversations, along with <br />previous documents prepared for the area. <br />The proposal is based on your July 9, 2021 email request, including the layout attached to the email. <br />The proposed base improvements will be generally as described below: <br />• Street construction & reconstruction of Ferret Street from 146' Avenue to Bunker Lake <br />Boulevard, <br />• Street reconstruction of 147" Avenue and 146" Avenue to the extents shown on the attached <br />figure, <br />• Extension of sanitary sewer, water and storm sewer to serve the area, and <br />• Improvements to Bunker Lake Boulevard necessary to allow for the Ferret Street connection. <br />Attached is a figure depicting anticipated improvements. <br />Project scope assumptions used in creating this fee proposal include the following: <br />• A topographic survey of the corridors will be completed under a separate contract. Information <br />from the survey will be used for the design of the project. <br />• Geotechnical borings will be required for the project. A total of 3 borings within the <br />redevelopment area will be required. We will use a combination of soil borings, record drawings <br />and recommendations from the City' s October 18, 2018 study to complete the pavement design <br />for the area roadways. <br />• Watermain will be installed in Ferret Street from 146th Avenue to Bunker Lake Boulevard, <br />connecting to the 12-inch watermain located in 147th Avenue and also connecting to the <br />watermain in Bunker Lake Boulevard. The watermain will also be extended along 146th Avenue <br />to the existing cul-de-sac bulb. Service lines and fire hydrants will be installed along the corridor <br />as -needed. The City will perform a leak test of the existing watermains in the area during the <br />design phase of the project. <br />Bolton & Menk is an equal. opportunity employer. <br />