My WebLink
|
Help
|
About
|
Sign Out
Home
12/06/88
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1980's
>
1988
>
12/06/88
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2025 11:11:33 AM
Creation date
2/24/2006 10:15:09 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning & Zoning Commission
Document Date
12/06/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The EIS on page 116 refers to the possibility of a temporary delay of <br />two years for airport improvements which would occur as a result of the <br />landfill operations. This again could only be assured through a time <br />limit imposed on the landfill expansion rather than simply approving <br />WM/~I's requested volume for the expansion. <br /> <br />The EIS on page 116 also refers to the development restrictions <br />imposed due to Site P. Those restrictions apply only within the area <br />of the candidate sites and buffer areas (MS 473.806 subd. l) not to <br />land outside of these areas. This is further supported in 473.831 <br />subd. I regarding debt obligations and 473.840, purchase of certain <br />property. Should this be interpreted in any way to be a development <br />restriction on the airport, Anoka County may find itself in a <br />situation where it would have to compensate the current landowners for <br />land required for airport use through acquisition of temporary <br />development rights. <br /> <br />At a recent public hearing for a Conditional Use Permit, WM~I stated <br />that they have since revised the height of the proposed landfill to <br />1020' MSL. This elevation would be below the horizontal surface of <br />the existing airport and aside from the period of time when vehicles <br />are operating on it should not infringe on protected airspace. This <br />proposed elevation should be reflected in the final EIS. The Pederal <br />Aviation Administration (FAA) is the responsible agency for making a <br />determination regarding whether the proposed landfill expansion would <br />create a hazard or greater hazard to air navigation. <br /> <br />On page 120, the excerpt from the draft airport master plan <br />indicating that "A check with area pilots and Mn/DOT relative to bird <br />strikes, close calls or other related problems, indicates that the <br />existing landfill has not been a bird attractor or created a hazard <br />area" is a statement that FA~ specifically raised an issue with. <br /> <br />The EIS on page 121 refers to "extending the hazard potential over the <br />landfills new operating life-something less than thr~e years". This <br />can only be true again based on a time limit to complete the landfill <br />expansion as well as a permitted volume. <br /> <br />The point that the EIS fails to consider is that the potential hazards <br />associated with the continuation of the landfill will increase, not <br />soley because of the .landfill itself, but also due to the increased <br />number of operations that have occurred and are expected to occur at <br />the airport. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.