My WebLink
|
Help
|
About
|
Sign Out
Home
12/06/88
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1980's
>
1988
>
12/06/88
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2025 11:11:33 AM
Creation date
2/24/2006 10:15:09 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning & Zoning Commission
Document Date
12/06/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The statements on page 124 regarding Site P development limitations <br />are interpreted which also leads to the conclusion that the <br />effective delay represents one year. The last sentence of the first <br />paragraph appears to indicate that MC concurs that landfills and <br />airports are mutually exclusive. The City also takes great issue <br />with the comment on page 124 that ..negotiation with the landfill owner <br />may be the most effective way to minimize the actual period the <br />landfill continues to operate". This is well within the authority of <br />MC to address through the CON process'and facility permitting as well <br />as through the City's local permit process. We do concur that impacts <br />may be mitigated by a contractural commitment to close the landfill by <br />a certain date. <br /> <br />Fiscal Impact <br /> <br />The EIS portrays projected revenues to state and local governments <br />over the 1987 to 1991 time period of the expansion. The projected <br />revenues indicate an estimated $2.0 million revenue base to the City <br />based on taxes and royalties. The majority of the fees received from <br />past landfill activity have been placed in a landfill trust for miti- <br />gation purposes and do not serve as a basis for the city's operating <br />budget. Within the past eight months, the City has expended landfill <br />funds for community projects including installation of a civil defense <br />system, fire department and park improvement expenditures. This <br />should be reflected on page 128 of the final EIS. The socio-economic <br />impact study conducted for the City in 1988, however, indicates a <br />minimum cost to the City of over $12 million dollars for hosting the <br />existing landfill. This does not take into account any value for <br />property devaluation, but does include costs associated with adminis- <br />tration, cost of sewer and water assessments and lost development <br />opportunity. The .--.IS states on page 128 that "there will be a period <br />of perhaps 20 years that will elapse before development will be <br />attempted on the landfill site." This is naive or terribly optimistic <br />considering the height, the proposed slopes, the depth of refuse, <br />generation of gas, set%!ement and long-term post closure concerns. <br /> <br />%~v=~ development limitations associated with site P as well as site P, <br />itself, would have a much greater fiscal impact on the Community than <br />does the expansion. <br /> <br />Fiscal Impacts on Surrounding Communities <br /> <br />Page 139 addresses the fact that Elk River has improved their <br />facilities and has expanded their operations. The document points out <br />that "increasing the active fill area at Elk River Landfill could lead <br />to a reassessment for this landfill". The document fails, to point <br />out, however, that a short-te-'-m use of the Elk River Landfill could <br />infuse additional capital for any monitoring and subsequent clean up <br />action that may be necessary thus benefitting the operator as well as <br />the environment, if the concern for a financially stable operator <br />expressed early in the document was sincere, it would seem to be <br />prudent to direct waste flow to a landfill which would help assure the <br />~inancia! requirements to address adequate clean up and closure. <br /> <br />7 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.