My WebLink
|
Help
|
About
|
Sign Out
Home
09/08/88
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1980's
>
1988
>
09/08/88
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2025 11:09:52 AM
Creation date
2/24/2006 10:35:12 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning & Zoning Commission
Document Date
09/08/1988
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'1 <br /> <br />Groundwater <br /> <br /> The yearly, mean water-table surface ranges from 12.0 ft of depth in <br />the north to 8.5 ft of depth in the south part of the proposed Site (refer <br /> <br />to fig. 2). <br /> <br /> Two groundwater-supply wells pump water from the upper part of the <br />upper or shallow aquifer (figs. 2 & 8) beneath the Bladholm property. One <br />is located on the north side of the concrete-pipe manufacturing building <br />(fig. 1), the south limit of which is shown in figure 2. The other well is <br />located about 500 ft northeast of the southeastern corner of the proposed <br />Site and on the east side of the Main or Office Building (fig. 1). The <br />latter well was completed on July 30, 1983 to about 102 ft of depth, is <br />constructed with a 6-in casing and wellscreen, and has a current pump <br />setting at about 80 ft (exhibit d, appendix C). It is estimated that the <br />well is pumped at a rate of about 45 gpm for a few hours each business day. <br />No water well record information is currently available (7) on the second or <br />pipe-manufacturing-building well. As observed at the site, the well is <br />constructed with a 6-in casing. It is probably comparable to the Office <br />Building well as to total depth, pump setting and groundwater yield. <br /> <br />Structures <br /> <br /> The concrete-pipe manufacturing plant is located about 250 ft north of <br />the north limit of the proposed Site (figs. i & 2). <br /> <br />Utilities <br /> <br /> The route of a 3-in steel gas pipeline (North Central Public Service <br />Company) in the southeast part of the proposed Site is depicted on figures 3 <br />through 6. <br /> <br />8803 12 <br /> <br />R.K. Hoagberg Associates, Inc. <br />Consulting Geologists <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.