My WebLink
|
Help
|
About
|
Sign Out
Home
10/12/88 Special
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1980's
>
1988
>
10/12/88 Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2025 11:10:45 AM
Creation date
2/24/2006 11:46:29 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning & Zoning Commission - Special
Document Date
10/12/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Borrow Area Activities <br /> <br />22. That in accord with City Code 170.017M a conditional use for <br /> grading, mining and filling may be issued for a maximum period of <br /> three (3) years, after which a permit renewal is required. Permit <br /> renewals are processed as an original request for a conditional <br /> use permit. <br /> <br />23. That ~q~/~I's borrow plan as submitted is divided into an east and <br /> west area consisting of 30 acres and 10 acres, respectively. <br /> <br />24. That WM~I has stated that the borrow operations would limit <br /> excavation to a minimum separation distance from ground water of <br /> 5'. or exceeding City Code of 6' above the elevation of the water <br /> table (9/8/88 public hearing). <br /> <br />25. That WM/~I has stated that borrow operations will maintain a <br /> minimum 200' setback from adjacent properties (9/8/88 public <br /> hearing) and as illustrated on the borrow area plan. <br /> <br />26. That WI~MI has stated that the approximate amount of material to be <br /> removed from the east borrow area is 400,000 yards and 150,000 <br /> yards from the west borrow area (9/8/88 public hearing). <br /> <br />27. That ~M/~I has stated the drainage for the east borrow area would <br /> be to the east and that drainage for the west borrow area would be <br /> to the natural flow area that exists on that portion of the site <br /> (9/14/88 public hearing). <br /> <br />Ski Hil!/Rec Area <br /> <br />28. That the preliminary site plan submitted by hq~MI indicates the ski <br /> hill development in concept and that details of the development <br /> should be addressed through site plan review of the final <br /> development plans. <br /> <br />29. That ~.~Q~-.I stated that they currently are preparing plans for <br /> submission to MPCA for the ski hill design and environmental <br /> control in order that the vertical expansion can be reviewed in <br /> conjunction wzth the remedial action proposed on the ~ (9/8/88 <br /> public hearing). <br /> <br />30. That ~.~-.i has s~a~ea that the re~u!atory agencies reject the <br /> ski kill for environmen~a! reasons, ~'.~2~-.i is prepared to dedicate <br /> ~u.u_e <br /> 50 acres of land to the City fcr ~'- ~ recreation development in <br /> ~he area as indicated on the plans (9/8/88 public hearing). <br /> 31. That ~5~! has indicated that the north slope of the landfill will <br /> .... c~..p.e.e~ - - ~ '~ ~ __nal cover in 1990 <br /> be ~ first area to be ^- ~ ' ~ <br /> (~/$/88 public hearing). <br /> <br />4 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.