Laserfiche WebLink
- A system for monitoring ground water levels and quality. <br />- A system for discharging and treating water pumped from the <br /> wells (MC EIS, p.1). <br /> <br />47. That MPCA has stated that the clean up and cover actions will.be <br /> required regardless of whether the expansion is approved or not. <br /> If the expansion is approved, however, the expansion would be <br /> integrated into the clean up action (staff conversation with Wayne <br /> Sappiro, MPCA staff and EIS on vertical expansion). <br /> <br />48. <br /> <br />That the approved final cover will consist of an engineered design <br />consisting of two barrier layers with the primary layer being a <br />synthetic liner material underlain by a second layer of impacted <br />lime sludge and clay (MC EIS, pp. 43-44). <br /> <br />Remaining Life/Waste Management System <br /> <br />49. That MC's EiS for the vertical expansion indicates that the <br /> landfill sequence would occur in 4-6 phases and would provide <br /> approximately 2.5 years capacity at 1985 waste intake rates. <br /> <br />50. <br /> <br />That ~q~2f..I has stated that if the vertical expansion is not given, <br />~M.I will continue to complete the facility in the manner which is <br />currently approved (per remedial action requirements) (9/14/88 <br />public hearing, parenthesis added). <br /> <br />51. That ~q~2~.I has stated that the site cannot be properly closed by <br /> 1990 (9/14/88 public hearing). <br /> <br />52. <br /> <br />That the applicant has stated that volume intake has been reduced <br />to approximately 20% of 1987 levels and that the remaining <br />capacity would carry operations through February, 1989 (9/8/88 <br />public hearing). <br /> <br />53. That the MC indicates that based on the annual use rate for the <br /> entire metropolitan region, available landfill capacity will be <br /> e×hausted within six years unless new capacity is created or waste <br /> reduction/resource recovery initiatives begin to take effect. <br /> <br />That ~h_ MC reoorts. '~a._h-~ in recen~ years landfills approaching <br />their anticipated closure dates have consistently cpera~ed beyond <br />expectations. <br /> <br />That the Ancka County Resource Recovery Plant is scheduled to be <br /> .... ~ ~ ~ , 1989 is <br />co..~.e_~a=_} operational by June ! and believed to be on <br />schedule (}Ir. A1 Tink!enberg, MC via engineers letter 9/14/88). <br /> <br />56. That a ne~ ~=nd=;~ site is ',~ ' ~ <br /> ........... ke_y to be established at Site P, <br /> D or Q before 1990 (selection to be made later 1989). <br /> <br />7 <br /> <br /> <br />